Cocoa, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Cocoa, straight from the official fee schedule, with a free permit fee calculator below.

In Cocoa, a building permit for a $50,000 remodel runs $317.78 in permit fees, a $20,000 re-roof $195.27, a $10,000 HVAC change-out $155.00, a $10,000 electrical panel upgrade or rewire $155.00, and a $10,000 whole-house repipe $155.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Cocoa Resolution No. 2026-042, Building Permit Fee Schedule (Exhibit A, effective July 1, 2026), with Resolution No. 2022-086 fire plan review fees

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective July 1, 2026. Last verified: September 27, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Cocoa Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Cocoa

Residential (1–2 family)
$75.00 for the first $1,000, plus $0.004 per additional $1 of job value (printed as $4 per $1,000 of construction cost)
Commercial / 3+ units
$100.00 for the first $1,000, plus $0.006 per additional $1 of job value (printed as $6 per $1,000 of construction cost)
Fire Plan Review Fee
tiered by job value (printed as $50 plus .0035 times the stated value)‡
Up to $1,000
$100.00
Over $1,000
$53.50 plus $3.50 per additional $1,000
Permit Application Processing Fee
$25.00
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Technology Fee
$15.00
Private Provider Inspections Reduction
may reduce the permit fee by 25%
Private Provider Plan Review Reduction
may reduce the permit fee by 25%
Addition of Subcontractor (if applicable)
$100.00
Change of Contractor or Subcontractor (if applicable)
$100.00
Failure to Schedule a Final Inspection (if applicable)
$100.00
Flood Plain Review/LOMR/CLOMR (if applicable)
$300.00
Permit Extension (if applicable)
$50.00
Plan Revisions (if applicable)
$100.00
Re-Inspection Fee (if applicable)
$100.00†
Temporary Certificate of Occupancy (if applicable)
$100.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Cocoa

Homeowners and contractors planning a project check Cocoa building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Cocoa Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Cocoa are the same either way.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

$
$2,500$500,000
Estimated building permit fee
$317.78
Included in this total
Building Permit Fee$271.00
$75.00 for the first $1,000 + $49,000 × $4.00 per additional $1,000
Printed as $4 per $1,000 of construction cost
Permit Application Processing Fee$25.00
Technology Fee$15.00
State Building Code Administrators Surcharge (F.S. 468.631)$4.07
State Building Permit Surcharge (F.S. 553.721)$2.71
Total Estimate$317.78

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Cocoa building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Cocoa

Homeowners and contractors planning a project check Cocoa building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Cocoa Permit Fee FAQs

How Much Does a Building Permit Cost in Cocoa?

The building permit for a $50,000 residential remodel runs $317.78, including the documented surcharges and minimum fees. The estimate is built from Cocoa's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Cocoa?

The roofing permit for a $20,000 residential re-roof runs $195.27, based on Cocoa's sourced fee schedule.

How Are Permit Fees Calculated in Cocoa?

A residential building permit is $75.00 for the first $1,000, plus $0.004 per additional $1 of job value (printed as $4 per $1,000 of construction cost). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Cocoa?

On top of the base permit fee, the sourced schedule adds Private Provider Inspections Reduction (may reduce the permit fee by 25%), Private Provider Plan Review Reduction (may reduce the permit fee by 25%), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Cocoa?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Cocoa Resolution No. 2026-042, Building Permit Fee Schedule (Exhibit A, effective July 1, 2026), with Resolution No. 2022-086 fire plan review fees. See the official schedule. Last verified .

Other Jurisdictions in Brevard County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.