Satellite Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Satellite Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Satellite Beach, a building permit for a $50,000 remodel runs $550.91 in permit fees, a $20,000 re-roof $265.24, a $10,000 HVAC change-out $170.88, a $10,000 electrical panel upgrade or rewire $170.88, and a $10,000 whole-house repipe $170.88. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Resolution No. 1075 - Building, Development, and Zoning Fees (eff. 10/1/2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $55.00.
How Satellite Beach values a job: The City calculates chargeable valuation as the greater of the ICC (International Code Council) building valuation data or the contracted price.
Schedule effective October 1, 2025. Last verified: July 22, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Satellite Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Satellite Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Satellite Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSatellite Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Satellite Beach are the same either way.
The City calculates chargeable valuation as the greater of the ICC (International Code Council) building valuation data or the contracted price.
Estimate only. Confirm with the Satellite Beach building department before applying.
Homeowners and contractors planning a project check Satellite Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSatellite Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Satellite Beach?
How Much Does a Roofing Permit Cost in Satellite Beach?
How Are Permit Fees Calculated in Satellite Beach?
What Is the Minimum Permit Fee in Satellite Beach?
What Surcharges Are Added to Permits in Satellite Beach?
Do I Need a Permit for a Small Residential Job in Satellite Beach?
Where Do These Fees Come From?
Other Jurisdictions in Brevard County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.