Building Permit Fees in Satellite Beach, FL (2026)

In Satellite Beach, a $50,000 kitchen remodel runs about $550.91 in permit fees, a $15,000 re-roof about $217.89, an $8,000 HVAC change-out about $152.13, a $12,000 electrical panel upgrade or rewire about $189.63, an $8,000 whole-house repipe about $152.13, and a new $350,000 single-family home about $2,571.53. Totals include the documented surcharges and minimum fees — pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $55.00. Fees from Resolution No. 1075 - Building, Development, and Zoning Fees (eff. 10/1/2025), last verified July 22, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

All projects
tiered rates (see fee table), minimum $55.00
$0–$1,000
$55.00
$1,000–$50,000
$55.00 + $6.25 per $1,000
$50,000–$100,000
$361.25 + $5.25 per $1,000
$100,000–$500,000
$623.75 + $4.25 per $1,000
Over $500,000
$2,323.75 + $3.25 per $1,000
FL BCAIF surcharge (DBPR, §468.631)
1.5% of the permit fee, minimum $2.00
FL building-code enforcement surcharge (§553.721)
1% of the permit fee, minimum $2.00
Life Safety Fee
25% of the permit fee
Plan Review Fee
50% of the permit fee

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Source

Resolution No. 1075 - Building, Development, and Zoning Fees (eff. 10/1/2025)

Schedule effective October 1, 2025. Last verified: July 22, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Satellite Beach are the same either way.

$
$500$50,000
Estimated mechanical / HVAC permit fee
$152.13
Mechanical / HVAC permit fee$98.75
tiered rates (see fee table), minimum $55.00
FL BCAIF surcharge (DBPR, §468.631)$2.00
Resolution 1075 does not print the statutory state surcharges and contains no surcharge-inclusive language; statutory 1.5% / $2.00 minimum applied (Winter Garden precedent). Added 2026-07-22 review.
FL building-code enforcement surcharge (§553.721)$2.00
Resolution 1075 does not print the statutory state surcharges and contains no surcharge-inclusive language; statutory 1.0% / $2.00 minimum applied (Winter Garden precedent). Added 2026-07-22 review.
Plan Review Fee$49.38
Source states: 'Plan review fee: 50% of the permit fee (new construction, additions, renovations)'. The parenthetical may scope this to new-construction/addition/renovation work only, excluding simple like-kind trade repairs/replacements — but the Add-On schema has no Work Type field to express that restriction, and Section 2 (p.1-2) defines ALL single-trade permits (electrical/plumbing/mechanical/reroof) as 'construction-related permits' subject to Section 3. Per owner policy for ambiguous scope, loaded broadly across all 5 permit types and all classes with needs_confirmation. ASK THE CITY: does the 50% plan review fee apply to simple single-trade repair/replacement permits, or only to new construction/addition/renovation work?
Total estimate$152.13

The City calculates chargeable valuation as the greater of the ICC (International Code Council) building valuation data or the contracted price.

Estimate only. Confirm with the Satellite Beach building department before applying.

Other jurisdictions in Brevard County