FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Titusville, FL (2026)

In Titusville, a building permit for a $50,000 remodel runs $397.70 in permit fees, a $20,000 re-roof $213.20, a $10,000 HVAC change-out $152.00, a $10,000 electrical panel upgrade or rewire $152.00, and a $10,000 whole-house repipe $152.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Titusville Ordinance No. 33-2021 – Building Inspection and Permit Fees (Sec. 6A-1, Table A / Table B)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Titusville values a job: Titusville prices permits on the actual construction cost you provide, unless the Building Official finds that understated, in which case valuation follows the latest ICC Building Valuation Data or another published cost source.

Last verified: July 20, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Titusville Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Titusville

Standard
tiered rates (see fee table)
$0–$1,000
$80.00
$1,000–$2,000
$100.00
$2,000–$100,000
$100.00 + $6.00 per $1,000
$100,000–$500,000
$688.00 + $5.00 per $1,000
$500,000–$2,000,000
$2,688.00 + $3.00 per $1,000
Over $2,000,000
$7,168.00 + $2.00 per $1,000
FL Statutory DBPR/BCAIB/CILB Fee (FS 468.631 + FS 553.721 combined)
2.5% of the permit fee, minimum $4.00
Re-inspection Fee (if applicable)
$100.00
Sponsor This Page
Be the Featured HVAC Company in Titusville

Homeowners and contractors planning a project check Titusville mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Titusville Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Titusville are the same either way.

$
$500$50,000
Estimated mechanical / HVAC permit fee
$152.00
Mechanical / HVAC permit fee$148.00
tiered rates (see fee table)
FL Statutory DBPR/BCAIB/CILB Fee (FS 468.631 + FS 553.721 combined)$4.00
Total Estimate$152.00

Titusville prices permits on the actual construction cost you provide, unless the Building Official finds that understated, in which case valuation follows the latest ICC Building Valuation Data or another published cost source.

Estimate only. Confirm with the Titusville building department before applying.

Sponsor This Page
Be the Featured HVAC Company in Titusville

Homeowners and contractors planning a project check Titusville mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Titusville Permit Fee FAQs

How Much Is a Building Permit in Titusville?

The building permit for a $50,000 residential remodel runs $397.70, including the documented surcharges and minimum fees. The estimate is built from Titusville's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Titusville?

The roofing permit for a $20,000 residential re-roof runs $213.20, based on Titusville's sourced fee schedule.

How Are Permit Fees Calculated in Titusville?

A residential building permit is tiered rates (see fee table). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Titusville?

On top of the base permit fee, the sourced schedule adds FL Statutory DBPR/BCAIB/CILB Fee (FS 468.631 + FS 553.721 combined) (2.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Titusville?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Titusville Ordinance No. 33-2021 – Building Inspection and Permit Fees (Sec. 6A-1, Table A / Table B). See the official schedule. Last verified .

Compare Permit Fees Across Brevard County

The same job, priced by each jurisdiction's own fee schedule. Across Brevard County's 11 covered jurisdictions, a building permit for a $50,000 remodel runs from $64.00 (Indian Harbour Beach) to $717.50 (Melbourne Beach).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Brevard County$275.10$175.80
Cape Canaveral$577.90$338.49
Cocoa Beach$367.98$183.69
Indian Harbour Beach$64.00$226.98
Melbourne$599.84$302.58
Melbourne Beach$717.50$410.00
Melbourne Village$491.33$202.31
Rockledge$404.88$174.25
Satellite Beach$550.91$265.24
Titusville$397.70$213.20
West Melbourne$472.75$114.00

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.