Brevard County, FL Permit Fees (2026)
Building permit fees for unincorporated Brevard County, with a free permit fee calculator. Inside city limits? Pick your city below; incorporated cities have their own fee schedules.
Brevard County's commercial Fire Prevention Review fee is scheduled to change to $56.00 plus 0.35% of job value on October 1, 2026 under the FY 2026-27 fire rates resolution heard August 25, 2026; adoption is not yet confirmed in posted minutes. Estimates use the FY 2025-26 rate of $54.00 plus 0.35%. See the official notice
In Unincorporated Brevard County, a building permit for a $50,000 remodel runs $275.73 in permit fees, a $20,000 re-roof $176.18, a $10,000 HVAC change-out $143.25, a $10,000 electrical panel upgrade or rewire $143.25, and a $10,000 whole-house repipe $143.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorBrevard County per-trade permit fee pages (brevardfl.gov, 13 pages) + FY 2025-26 Fire Rescue rates resolution (Legistar)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Unincorporated Brevard County permit portal, or call (321) 633-2187.
How Unincorporated Brevard County values a job: Brevard County calculates the Building Code Review fee on the job's construction value; for new construction it uses the greater of the contract construction value or the latest ICC Building Valuation Data table value. The commercial Fire Prevention Review fee applies the same greater-of-construction-value-or-ICC-table basis to all commercial projects, including remodels, renovations and repairs, not only new construction.
Last verified: September 27, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Jurisdictions in Brevard County
Jobs inside city limits are permitted by the city, not the county. Across Brevard County's 15 covered jurisdictions, a building permit for a $50,000 remodel runs from $64.00 (Indian Harbour Beach) to $717.50 (Melbourne Beach).
Unincorporated Brevard County Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Unincorporated Brevard County
Homeowners and contractors planning a project check Unincorporated Brevard County roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageUnincorporated Brevard County Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Unincorporated Brevard County are the same either way.
Brevard County's commercial Fire Prevention Review fee is scheduled to change to $56.00 plus 0.35% of job value on October 1, 2026 under the FY 2026-27 fire rates resolution heard August 25, 2026; adoption is not yet confirmed in posted minutes. Estimates use the FY 2025-26 rate of $54.00 plus 0.35%. See the official notice
Brevard County calculates the Building Code Review fee on the job's construction value; for new construction it uses the greater of the contract construction value or the latest ICC Building Valuation Data table value. The commercial Fire Prevention Review fee applies the same greater-of-construction-value-or-ICC-table basis to all commercial projects, including remodels, renovations and repairs, not only new construction.
Estimate only. Confirm with the Unincorporated Brevard County building department before applying. Apply online. Phone: (321) 633-2187. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Unincorporated Brevard County roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Unincorporated Brevard County
Brevard County issues building permits for the unincorporated areas of the county through its Planning and Development Department in Viera. Online permitting runs through Brevard's Advanced Service Site, known as BASS, where licensed contractors who are registered online users can apply, upload documents, track application status, schedule inspections, and pay fees 24 hours a day, 7 days a week. Online permitting is only available to licensed contractors, so check your license status in the county's Licensed Contractor Search before you apply.
Owners acting as their own contractor must apply in person. Call (321) 633-2187 to ask about the required forms and to schedule an in office appointment. Walk-in applications are accepted at the Viera government center, and the county asks that supporting documents be submitted digitally, either uploaded to the BASS application or brought on a flash drive. For other in person visits, appointments are encouraged but not required.
Inspections are requested through BASS. Inspection scheduling closes at 4:00 PM for the following day. Virtual inspections are also available to contractors, field agents, and homeowners through the VuSpex GO app; those are not scheduled in advance, you simply log in and submit a field report, and results are emailed to the contacts on the permit.
Source: Unincorporated Brevard County application instructions
Apply online: Unincorporated Brevard County permit portal- Phone
- (321) 633-2187
- Address
- 2725 Judge Fran Jamieson Way, Viera, FL 32940
- Source
- Official contact page
Unincorporated Brevard County Permit Fee FAQs
How Much Does a Building Permit Cost in Unincorporated Brevard County?
How Much Does a Roofing Permit Cost in Unincorporated Brevard County?
How Are Permit Fees Calculated in Unincorporated Brevard County?
What Surcharges Are Added to Permits in Unincorporated Brevard County?
Do I Need a Permit for a Small Residential Job in Unincorporated Brevard County?
Where Do These Fees Come From?
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.