FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Atlantic Beach, FL (2026)

In Atlantic Beach, a building permit for a $50,000 remodel runs $784.13 in permit fees, a $20,000 re-roof $205.00, a $10,000 HVAC change-out $164.40, a $10,000 electrical panel upgrade or rewire $215.25, and a $10,000 whole-house repipe $215.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

July 2026 New Fees (Building/Electrical/Plumbing/Mechanical/Fire/Public Works/Zoning Fee Schedule, per Ord. No. 5-26-75)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective July 14, 2026. Last verified: August 19, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Atlantic Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Atlantic Beach

Residential (1–2 family): Alteration-Repair
$765.00 flat
Residential (1–2 family): New Construction
$1,200.00 flat
Residential (1–2 family): Accessory Structure
$635.00 flat
Residential (1–2 family): Addition
$865.00 flat
Residential (1–2 family): Alteration-Repair, work area 2,501-3,999 sq ft (×1.5)
$1,147.50 flat (printed $765 × 1.5 per the schedule's work-area footnote)
Residential (1–2 family): Alteration-Repair, work area 4,000+ sq ft (×2)
$1,530.00 flat (printed $765 × 2 per the schedule's work-area footnote)
Residential (1–2 family): Deck
$450.00 flat
Residential (1–2 family): Demolition (Whole Structure)
$480.00 flat
Residential (1–2 family): Fence (Pool Enclosure)
$165.00 flat
Residential (1–2 family): Foundation Repair
$205.00 flat
Residential (1–2 family): Interior Demolition
$260.00 flat
Residential (1–2 family): Mobile Home Placement
$545.00 flat
Residential (1–2 family): Outdoor Kitchen
$745.00 flat
Residential (1–2 family): Pool (Above-Ground)
$495.00 flat
Residential (1–2 family): Pool (In-Ground)
$570.00 flat
Residential (1–2 family): Solar
$435.00 flat
Residential (1–2 family): Spa/Hot Tub
$435.00 flat
Residential (1–2 family): Window/Door/Shutter
$255.00 flat
Residential (1–2 family): Foundation Only (New)
$625.00 flat
Residential (1–2 family): Work area 2,501-3,999 sq ft (×1.5)
$1,800.00 flat (printed $1,200 × 1.5 per the schedule's work-area footnote)
Residential (1–2 family): Work area 4,000+ sq ft (×2)
$2,400.00 flat (printed $1,200 × 2 per the schedule's work-area footnote)
Commercial / 3+ units: Alteration-Repair (Existing Tenant)
$1,010.00 flat
Commercial / 3+ units: New Construction (New Tenant)
$1,410.00 flat
Commercial / 3+ units: Accessory Structure
$955.00 flat
Commercial / 3+ units: Addition (Existing Tenant)
$1,145.00 flat
Commercial / 3+ units: Alteration-Repair, work area 2,501-3,999 sq ft (×1.5)
$1,515.00 flat (printed $1,010 × 1.5 per the schedule's work-area footnote)
Commercial / 3+ units: Alteration-Repair, work area 4,000+ sq ft (×2)
$2,020.00 flat (printed $1,010 × 2 per the schedule's work-area footnote)
Commercial / 3+ units: Demolition (Whole Structure)
$555.00 flat
Commercial / 3+ units: Fence
$515.00 flat
Commercial / 3+ units: Foundation Repair
$205.00 flat
Commercial / 3+ units: Generator
$505.00 flat
Commercial / 3+ units: Interior Demolition
$275.00 flat
Commercial / 3+ units: Pool (In-Ground)
$960.00 flat
Commercial / 3+ units: Solar
$385.00 flat
Commercial / 3+ units: Spa/Hot Tub
$505.00 flat
Commercial / 3+ units: Window/Door/Shutter
$275.00 flat
Commercial / 3+ units: Buildout (New Tenant)
$990.00 flat
Commercial / 3+ units: Foundation Only (New)
$700.00 flat
Commercial / 3+ units: New Construction, work area 2,501-3,999 sq ft (×1.5)
$2,115.00 flat (printed $1,410 × 1.5 per the schedule's work-area footnote)
Commercial / 3+ units: New Construction, work area 4,000+ sq ft (×2)
$2,820.00 flat (printed $1,410 × 2 per the schedule's work-area footnote)
Commercial / 3+ units: Shell (No Tenant)
$1,275.00 flat
Atlantic Beach - FL Building Code Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Atlantic Beach - FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured General Contractor in Atlantic Beach

Homeowners and contractors planning a project check Atlantic Beach building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Atlantic Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
Estimated building permit fee
$784.13
Building permit fee$765.00
$765.00 flat
Atlantic Beach - FL Building Code Surcharge (F.S. 468.631)$11.48
Atlantic Beach - FL Building Code Surcharge (F.S. 553.721)$7.65
Total Estimate$784.13

Estimate only. Confirm with the Atlantic Beach building department before applying.

Sponsor This Page
Be the Featured General Contractor in Atlantic Beach

Homeowners and contractors planning a project check Atlantic Beach building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Atlantic Beach Permit Fee FAQs

How Much Is a Building Permit in Atlantic Beach?

The building permit for a $50,000 residential remodel runs $784.13, including the documented surcharges and minimum fees. The estimate is built from Atlantic Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Atlantic Beach?

The roofing permit for a $20,000 residential re-roof runs $205.00, based on Atlantic Beach's sourced fee schedule.

How Are Permit Fees Calculated in Atlantic Beach?

A residential building permit is $765.00 flat. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Atlantic Beach?

On top of the base permit fee, the sourced schedule adds Atlantic Beach - FL Building Code Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and Atlantic Beach - FL Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Atlantic Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from July 2026 New Fees (Building/Electrical/Plumbing/Mechanical/Fire/Public Works/Zoning Fee Schedule, per Ord. No. 5-26-75). See the official schedule. Last verified .

Compare Permit Fees Across Duval County

The same job, priced by each jurisdiction's own fee schedule. Across Duval County's 5 covered jurisdictions, a building permit for a $50,000 remodel runs from $400.25 (Unincorporated Duval County) to $784.13 (Atlantic Beach).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Duval County$400.25$171.75
Atlantic Beach$784.13$205.00
Jacksonville$400.25$171.75
Jacksonville Beach$465.13$236.83
Neptune Beach$599.63$228.58

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.