Neptune Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Neptune Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Neptune Beach, a building permit for a $50,000 remodel runs $599.63 in permit fees, a $20,000 re-roof $305.38, an HVAC change-out $91.00, a $10,000 electrical panel upgrade or rewire $351.58, and a whole-house repipe $233.70. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution No. 2026-10, Exhibit A (2026 Fee Resolution), City of Neptune Beach
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Neptune Beach permit portal, or call 904-270-2400.
Schedule effective July 20, 2026. Last verified: September 26, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Neptune Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Neptune Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Neptune Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageNeptune Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Neptune Beach are the same either way.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Neptune Beach building department before applying. Apply online. Phone: 904-270-2400. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Neptune Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Neptune Beach
Neptune Beach reviews and issues its own building, roofing, electrical, plumbing, and mechanical permits through the Building and Zoning Department at City Hall, 116 First Street. Download the application for your permit type from the city's Permit Applications page and submit it with your plans to the Building Department, where the $48 permit issuance fee is due at submittal. Call 904-270-2400 with permit questions and 904-270-2430 to request inspections.
Source: Neptune Beach application instructions
Apply online: Neptune Beach permit portal- Phone
- 904-270-2400 (inspections 904-270-2430)
- bldgclerk@nbfl.us
- Address
- 116 First Street, Neptune Beach, FL 32266
- Source
- Official contact page
Neptune Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Neptune Beach?
How Much Does a Roofing Permit Cost in Neptune Beach?
How Are Permit Fees Calculated in Neptune Beach?
What Surcharges Are Added to Permits in Neptune Beach?
Do I Need a Permit for a Small Residential Job in Neptune Beach?
Where Do These Fees Come From?
Other Jurisdictions in Duval County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.