Graceville, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Graceville, straight from the official fee schedule, with a free permit fee calculator below.

Jackson County Building Services issues, inspects and charges building permits inside the City of Graceville, which has no building department of its own, so the county's fee schedule applies here. Jackson County's development order fee ($50 per new residential site; 5 cents per square foot of impervious area, $250 minimum, for new commercial development) appears in estimates, but it likely does not apply here: the county's permit checklists say projects inside city limits get their development order from the city instead. The City's Land Use Code authorizes its own development permit and zoning fees (schedule posted at Graceville City Hall); those are not included here. See the Jackson County fee schedule

In Graceville, a building permit for a $50,000 remodel runs $448.95 in permit fees, a $20,000 re-roof $65.00, and a $10,000 electrical panel upgrade or rewire $115.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Building Department Fee Schedule, Effective April 4, 2016 (Jackson County Building Services, fee-scheduletagged.pdf)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Jackson County Building Services issues, inspects and charges building permits inside the City of Graceville, which has no building department of its own, so the county's fee schedule applies here. Jackson County's development order fee ($50 per new residential site; 5 cents per square foot of impervious area, $250 minimum, for new commercial development) appears in estimates, but it likely does not apply here: the county's permit checklists say projects inside city limits get their development order from the city instead. The City's Land Use Code authorizes its own development permit and zoning fees (schedule posted at Graceville City Hall); those are not included here. See the Jackson County fee schedule

How Graceville values a job: Chargeable valuation may be determined by group and type of construction using Appendix B and the Building Valuation Data Table (Schedule B), at 70% of the calculated values. For commercial work, when the contractor's cost and the valuation table conflict, the permit is based on the higher of the two.

Schedule effective April 4, 2016. Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Graceville Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Graceville

All projects
tiered rates by squares
Up to 5 squares
$36.00
Over 5, up to 15 squares
$56.00
Over 15 squares
$56.00 plus $1.00 per additional square
State Building Permit Surcharges (F.S. 553.721 + 468.631, combined)
2.5% of the permit fee, minimum $4.00
Jackson County - Reinspection Fee (1st) (if applicable)
$40.00
Sponsor This Page
Be the Featured Roofer in Graceville

Homeowners and contractors planning a project check Graceville roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Graceville Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
squares
560 squares
Estimated roofing permit fee
$65.00
Included in this total
Roofing Permit Fee$61.00
$56.00 + 5 × $1.00 per square over 15 squares (see the fee table above)
State Building Permit Surcharges (F.S. 553.721 + 468.631, Combined)$4.00
Total Estimate$65.00

Permit fees for Graceville are administered by Jackson County; the fees shown are the Jackson County schedule.

Estimate only. Confirm with the Jackson County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Graceville

Homeowners and contractors planning a project check Graceville roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Graceville Permit Fee FAQs

How Much Does a Building Permit Cost in Graceville?

The building permit for a $50,000 residential remodel runs $448.95, including the documented surcharges and minimum fees. The estimate is built from Graceville's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Graceville?

The roofing permit for a $20,000 residential re-roof runs $65.00, assuming a 2,000 sq ft (20-square) roof where the schedule prices per unit, based on Graceville's sourced fee schedule.

How Are Permit Fees Calculated in Graceville?

A residential building permit is tiered rates by job value, minimum $46.00. Electrical permits are flat fees for the default job (Additions, Alterations, Accessory Structure), while other work is priced per amp or is priced per unit; Plumbing permits are priced per unit; Mechanical / HVAC permits are priced per system; Roofing permits are priced per square. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Graceville?

On top of the base permit fee, the sourced schedule adds Jackson County - Commercial Plan Review Fee (50% of the permit fee) and State Building Permit Surcharges (F.S. 553.721 + 468.631, combined) (2.5% of the permit fee, minimum $4.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Graceville?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Building Department Fee Schedule, Effective April 4, 2016 (Jackson County Building Services, fee-scheduletagged.pdf). See the official schedule. Last verified .

Other Jurisdictions in Jackson County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.