Marianna, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Marianna, straight from the official fee schedule, with a free permit fee calculator below.
In Marianna, a building permit for a $50,000 remodel runs $351.25 in permit fees, a $20,000 re-roof $134.00, a $10,000 HVAC change-out $147.00, a $10,000 electrical panel upgrade or rewire $147.00, and a $10,000 whole-house repipe $147.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Marianna Resolution 2019-22 (Building Fee Schedule, adopted July 2, 2019) and Resolution 2026-12 (Development Fee Schedule, adopted April 7, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Marianna values a job: Marianna charges permit fees on the value of the work, determined where applicable from the International Code Council's most recent Building Valuation Data per square foot of area under roof by type of construction. The adopted schedule states these are maximum fees and that fees may be lower depending on project complexity.
Schedule effective July 2, 2019. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Marianna Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Marianna
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Marianna roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMarianna Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Marianna are the same either way.
Marianna charges permit fees on the value of the work, determined where applicable from the International Code Council's most recent Building Valuation Data per square foot of area under roof by type of construction. The adopted schedule states these are maximum fees and that fees may be lower depending on project complexity.
Estimate only. Confirm with the Marianna building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Marianna roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMarianna Permit Fee FAQs
How Much Does a Building Permit Cost in Marianna?
How Much Does a Roofing Permit Cost in Marianna?
How Are Permit Fees Calculated in Marianna?
What Surcharges Are Added to Permits in Marianna?
Do I Need a Permit for a Small Residential Job in Marianna?
Where Do These Fees Come From?
Other Jurisdictions in Jackson County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.