FreeEvery fee straight from the official city and county fee schedules. No signup.

Fort Myers Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Fort Myers Beach, straight from the official fee schedule, with a free permit fee calculator below.

In Fort Myers Beach, a building permit for a $50,000 remodel runs $916.88 in permit fees, a $20,000 re-roof $408.75, a $10,000 HVAC change-out $256.25, a $10,000 electrical panel upgrade or rewire $256.25, and a $10,000 whole-house repipe $256.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Fort Myers Beach Resolution No. 26-211, Adopting the Final Fee Schedule for Fiscal Year 2027, Exhibit A (FY 2026-2027 Building Permit Fee Schedule, pp.23-32); adopted Sept 23, 2026

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Fort Myers Beach permit portal, or call 239-765-0202.

Schedule effective October 1, 2026. Last verified: October 5, 2026

This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed

Fort Myers Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Fort Myers Beach

All projects
$250.00 flat†
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Change of Contractor (if applicable)
$75.00
Environmental Review (trade permits) (if applicable)
$75.00‡
Flood Review (trade permits) (if applicable)
$75.00‡
Plan Revision (After Permit Issuance) (if applicable)
$100.00
Temporary Certificate of Occupancy (if applicable)
$225.00
Inspection Lock-Out (inspector could not access site) (if applicable)
$100.00
Inspection/Partial Pass (additional inspection requested by contractor) (if applicable)
$75.00
Permit Extension (first 3 months) (if applicable)
$135.00
Permit Extension (second 3 months) (if applicable)
$200.00
Re-inspection After Failed Inspection (if applicable)
$75.00
Reissuance of Expired Permit (trade) (if applicable)
$150.00
Resubmittal Fee (after first resubmittal) (if applicable)
$100.00
Stormwater Review (trade permits) (if applicable)
$50.00‡
Zoning Review (trade permits) (if applicable)
$50.00‡

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Fort Myers Beach

Homeowners and contractors planning a project check Fort Myers Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Fort Myers Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated electrical permit fee
$256.25
Included in this total
Electrical Permit Fee$250.00
$250.00 flat
State Building Code Administrators Surcharge (F.S. 468.631)$3.75
State Building Permit Surcharge (F.S. 553.721)$2.50
Total Estimate$256.25

Estimate only. Confirm with the Fort Myers Beach building department before applying. Apply online. Phone: 239-765-0202. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Fort Myers Beach

Homeowners and contractors planning a project check Fort Myers Beach electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Fort Myers Beach

Submit new permit applications online through the Town of Fort Myers Beach GovWell portal. For permits issued earlier through iWorQ, keep using the iWorQ portal to request inspections: enter your permit number, click Search, and choose Request an Inspection with the access code issued with your permit. Fees must be paid before any reviews are completed, and owner-builders may apply online but must pick up permits at the permitting office at Town Hall. Fire inspections are scheduled separately by emailing prevention@fmbfire.org with the permit number, address, and inspection type.

Source: Fort Myers Beach application instructions

Apply online: Fort Myers Beach permit portal
Building Department Contact
Address
6231 Estero Blvd, Fort Myers Beach, FL 33931
Hours
Monday through Friday, 8:30 a.m. to 4:30 p.m.

Fort Myers Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Fort Myers Beach?

The building permit for a $50,000 residential remodel runs $916.88, including the documented surcharges and minimum fees. The estimate is built from Fort Myers Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Fort Myers Beach?

The roofing permit for a $20,000 residential re-roof runs $408.75, based on Fort Myers Beach's sourced fee schedule.

How Are Permit Fees Calculated in Fort Myers Beach?

A residential building permit is $675.00 flat. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Fort Myers Beach?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Fort Myers Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Fort Myers Beach Resolution No. 26-211, Adopting the Final Fee Schedule for Fiscal Year 2027, Exhibit A (FY 2026-2027 Building Permit Fee Schedule, pp.23-32); adopted Sept 23, 2026. See the official schedule. Last verified .

Other Jurisdictions in Lee County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.