Fort Myers, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Fort Myers, straight from the official fee schedule, with a free permit fee calculator below.
The City of Fort Myers has commissioned a study to convert its valuation-based building permit fees in response to Florida HB 803 (2026). Fees may change when the city adopts a new schedule; confirm current fees with the Building, Permitting and Inspections Division. See the official notice
In Fort Myers, a building permit for a $50,000 remodel runs $1,302.58 in permit fees, a $20,000 re-roof $157.25, a $10,000 HVAC change-out $102.00, a $10,000 electrical panel upgrade or rewire $157.25, and a $10,000 whole-house repipe $157.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorAll Other Permit Types Permit Calculator (xlsx); Over the Counter Permits (PDF) - adopted per Resolution 2025-96, eff. 8/5/2025
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Fort Myers permit portal, or call 239-321-7925.
How Fort Myers values a job: Job valuation includes the fair market value of design fees, site preparation, labor, materials, sub-trades and mechanical trades, roofing, elevators, and overhead and profit, but excludes items that require a separate permit. For new buildings the city sets valuation from the ICC Building Valuation Data table; for other improvements it uses RS Means.
Schedule effective August 5, 2025. Last verified: September 25, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Fort Myers Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Fort Myers
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Fort Myers building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageFort Myers Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
The City of Fort Myers has commissioned a study to convert its valuation-based building permit fees in response to Florida HB 803 (2026). Fees may change when the city adopts a new schedule; confirm current fees with the Building, Permitting and Inspections Division. See the official notice
Job valuation includes the fair market value of design fees, site preparation, labor, materials, sub-trades and mechanical trades, roofing, elevators, and overhead and profit, but excludes items that require a separate permit. For new buildings the city sets valuation from the ICC Building Valuation Data table; for other improvements it uses RS Means.
Estimate only. Confirm with the Fort Myers building department before applying. Apply online. Phone: 239-321-7925. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Fort Myers building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Fort Myers
Fort Myers building permits are applied for, tracked, and paid online through the city's EnerGov Customer Self Service Portal, where you upload the application and plans; the city emails any corrections and notifies you of fees due, which you can pay in the portal. Over-the-counter trade permits (such as A/C change-outs, re-roofs, and electrical or plumbing repairs) carry flat fees; larger jobs pay plan review fees before review and permit fees at issuance. Inspections are scheduled online through the same portal using the permit number and the 3-digit inspection code; requests received after 5:30 a.m. are scheduled for the next business day. The Building, Permitting and Inspections Division is at 1825 Hendry St., Suite 101, Fort Myers.
Source: Fort Myers application instructions
Apply online: Fort Myers permit portal- Phone
- 239-321-7925
- Address
- 1825 Hendry St., Suite 101, Fort Myers, FL 33901
- Inspections
- 239-321-7920
- Source
- Official contact page
Fort Myers Permit Fee FAQs
How Much Does a Building Permit Cost in Fort Myers?
How Much Does a Roofing Permit Cost in Fort Myers?
How Are Permit Fees Calculated in Fort Myers?
What Surcharges Are Added to Permits in Fort Myers?
Do I Need a Permit for a Small Residential Job in Fort Myers?
Where Do These Fees Come From?
Other Jurisdictions in Lee County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.