Layton, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Layton, straight from the official fee schedule, with a free permit fee calculator below.
In Layton, a building permit for a $50,000 remodel runs $1,637.50 in permit fees, a $20,000 re-roof $715.00, a $10,000 HVAC change-out $307.50, a $10,000 electrical panel upgrade or rewire $307.50, and a $10,000 whole-house repipe $307.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Layton Code Sec. 2-71 to 2-77, Building Permit Fees (codified through Supp. 2, last amended by Ord. No. 2018-12-01)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $40.00.
Call the building department at 305-664-4667.
How Layton values a job: Chargeable valuation is the value of the work, including material and labor; a signed, notarized contract may be required to establish the value.
Schedule effective January 10, 2019. Last verified: September 5, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Layton Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in Layton
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Layton plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageLayton Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Chargeable valuation is the value of the work, including material and labor; a signed, notarized contract may be required to establish the value.
Estimate only. Confirm with the Layton building department before applying. Phone: 305-664-4667. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Layton plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Layton
Layton does not have an online permit portal. Download the City of Layton permit application and related forms from the Building Department page on the city website. Submit the completed application, plans and fee to Layton City Hall at 68260 Overseas Highway, or contact the Building Department by email or phone for submission instructions. Electrical, plumbing, air conditioning and sign work each need a separate permit. Contractors must register with the city before pulling permits. Pay by check made out to the City of Layton; the city states that credit cards are not accepted. To schedule an inspection, call the Building Department at 305-664-4667.
Source: Layton application instructions
- Phone
- 305-664-4667
- Address
- 68260 Overseas Hwy, Layton, FL 33001 (mail: PO Box 778, Long Key, FL 33001)
- Hours
- not published
- Source
- Official contact page
Layton Permit Fee FAQs
How Much Does a Building Permit Cost in Layton?
How Much Does a Roofing Permit Cost in Layton?
How Are Permit Fees Calculated in Layton?
What Is the Minimum Permit Fee in Layton?
What Surcharges Are Added to Permits in Layton?
Do I Need a Permit for a Small Residential Job in Layton?
Where Do These Fees Come From?
Other Jurisdictions in Monroe County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.