Apopka, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Apopka, straight from the official fee schedule, with a free permit fee calculator below.
Apopka's published minimum permit fee ($75 on the city's Permitting Fees page) differs from the figure in the codified ordinance ($50). Confirm your minimum with the Building-Safety Department before budgeting. See the official notice
In Apopka, a building permit for a $50,000 remodel runs $571.88 in permit fees, a $20,000 re-roof $154.25, a $10,000 HVAC change-out $79.00, a $10,000 electrical panel upgrade or rewire $79.00, and a $10,000 whole-house repipe $79.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Apopka Permitting Fees (Code Ch. 18 Art. III)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $75.00.
Apply online at the Apopka permit portal, or call 407-703-1713.
How Apopka values a job: Apopka charges fees on the signed contract price or the ICC Building Valuation Data table value, whichever is greater.
Schedule effective April 21, 2010. Last verified: September 27, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Apopka Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Apopka
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Apopka electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageApopka Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Apopka are the same either way.
Apopka's published minimum permit fee ($75 on the city's Permitting Fees page) differs from the figure in the codified ordinance ($50). Confirm your minimum with the Building-Safety Department before budgeting. See the official notice
Apopka charges fees on the signed contract price or the ICC Building Valuation Data table value, whichever is greater.
Estimate only. Confirm with the Apopka building department before applying. Apply online. Phone: 407-703-1713. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Apopka electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Apopka
Apopka issues building permits through the Building-Safety Department of Community Development Services, and all applications go through the city's OpenGov permitting portal at apopkafl.portal.opengov.com. Builders, sub-contractors, businesses, and homeowners create an account and apply there; sub-contractors apply under the trade they are performing, one application per trade. A licensed contractor registered with the City of Apopka must submit the application: registration means filing a current workers compensation certificate naming the City of Apopka as certificate holder, the current state license, and an Orange County competency license. An owner of a single family dwelling, or a commercial building not being sold or leased, may apply as an owner builder with proof of ownership and an owner builder affidavit. Fees are calculated from the signed contract or the ICC Building Valuation Data table value, whichever is greater, so bring the signed contract. Commercial and multi family plans also route to the Fire Department's Risk Reduction division before the permit issues, which carries its own fee. In person help is at the Building-Safety Department, second floor of 120 E. Main Street, Monday through Friday 8 AM to 4:30 PM. Inspections are requested on your permit record in the OpenGov portal; if you cannot reach the scheduling function, call 407-703-1713. Permits are valid for 180 days from issuance or 90 days after the last approved inspection.
Source: Apopka application instructions
Apply online: Apopka permit portal- Phone
- 407-703-1713
- Building@apopka.net
- Address
- 120 E. Main Street, Second Floor, Apopka, FL 32703
- Hours
- Monday through Friday, 8:00 AM to 4:30 PM (office); inspectors Monday through Friday, 7:00 AM to 3:30 PM
- Source
- Official contact page
Apopka Permit Fee FAQs
How Much Does a Building Permit Cost in Apopka?
How Much Does a Roofing Permit Cost in Apopka?
How Are Permit Fees Calculated in Apopka?
What Is the Minimum Permit Fee in Apopka?
What Surcharges Are Added to Permits in Apopka?
Do I Need a Permit for a Small Residential Job in Apopka?
Where Do These Fees Come From?
Other Jurisdictions in Orange County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.