Edgewood, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Edgewood, straight from the official fee schedule, with a free permit fee calculator below.
Orange County's Division of Building Safety issues, inspects, and charges building, electrical, plumbing, mechanical, and roofing permits in Edgewood at the same rates as unincorporated Orange County under the City's interlocal agreement (approved 2005, extended in 2020), so the county's fee schedule applies here. Apply to the City first for zoning review: a new single-family home pays the City's $500 application fee (included in new-home estimates) plus a $2,500 pass-through deposit that the City bills its consultants' review costs against and refunds any balance of; pools ($50 plus a pass-through deposit), accessory structures ($50), fences and walls ($50), signs ($100 plus a $750 deposit) and boat docks ($350 plus a $2,500 deposit) carry their own City fees. Orange County's zoning review fees are included in estimates as a precaution, but the City does its own zoning review, so ask the county whether they are charged inside Edgewood. See the Orange County fee schedule
Orange County, which issues Edgewood's building permits, adopted new building permit fees (Resolution 2026-M-39) and Fire Rescue fees (Resolution 2026-M-38) on July 16, 2026, taking effect October 1, 2026, or as soon afterward as practical. Estimates on this page use the new rates, including the new private provider percentages; permits issued before the change are charged the prior rates. See the official notice
In Edgewood, a building permit for a $50,000 remodel runs $259.55 in permit fees, a $20,000 re-roof $125.00, a $10,000 HVAC change-out $42.00, a $10,000 electrical panel upgrade or rewire $141.00, and a $10,000 whole-house repipe $42.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorOrange County Fee Directory, Fiscal Year 2025–2026, as amended by Resolutions 2026-M-38 and 2026-M-39 (adopted July 16, 2026; new rates effective October 1, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Orange County's Division of Building Safety issues, inspects, and charges building, electrical, plumbing, mechanical, and roofing permits in Edgewood at the same rates as unincorporated Orange County under the City's interlocal agreement (approved 2005, extended in 2020), so the county's fee schedule applies here. Apply to the City first for zoning review: a new single-family home pays the City's $500 application fee (included in new-home estimates) plus a $2,500 pass-through deposit that the City bills its consultants' review costs against and refunds any balance of; pools ($50 plus a pass-through deposit), accessory structures ($50), fences and walls ($50), signs ($100 plus a $750 deposit) and boat docks ($350 plus a $2,500 deposit) carry their own City fees. Orange County's zoning review fees are included in estimates as a precaution, but the City does its own zoning review, so ask the county whether they are charged inside Edgewood. See the Orange County fee schedule
How Edgewood values a job: Orange County values construction at its per-square-foot occupancy/construction-type table (Fee Directory pp. 28–33) × square footage, or your contract valuation if greater. If the county’s valuation exceeds your contract price, the actual fee will be higher than this estimate.
Schedules effective July 1, 2025 – October 1, 2026. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Edgewood Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Edgewood
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Edgewood electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageEdgewood Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
5 documented rates for this permit type; pick the one that matches your job.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
Orange County, which issues Edgewood's building permits, adopted new building permit fees (Resolution 2026-M-39) and Fire Rescue fees (Resolution 2026-M-38) on July 16, 2026, taking effect October 1, 2026, or as soon afterward as practical. Estimates on this page use the new rates, including the new private provider percentages; permits issued before the change are charged the prior rates. See the official notice
Orange County values construction at its per-square-foot occupancy/construction-type table (Fee Directory pp. 28–33) × square footage, or your contract valuation if greater. If the county’s valuation exceeds your contract price, the actual fee will be higher than this estimate.
Permit fees for Edgewood are administered by Orange County; the fees shown are the Orange County schedule.
Estimate only. Confirm with the Orange County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Edgewood electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageEdgewood Permit Fee FAQs
How Much Does a Building Permit Cost in Edgewood?
How Much Does a Roofing Permit Cost in Edgewood?
How Are Permit Fees Calculated in Edgewood?
What Surcharges Are Added to Permits in Edgewood?
Do I Need a Permit for a Small Residential Job in Edgewood?
Where Do These Fees Come From?
Other Jurisdictions in Orange County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.