FreeEvery fee straight from the official city and county fee schedules. No signup.

Edgewood, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Edgewood, straight from the official fee schedule, with a free permit fee calculator below.

Orange County's Division of Building Safety issues, inspects, and charges building, electrical, plumbing, mechanical, and roofing permits in Edgewood at the same rates as unincorporated Orange County under the City's interlocal agreement (approved 2005, extended in 2020), so the county's fee schedule applies here. Apply to the City first for zoning review: a new single-family home pays the City's $500 application fee (included in new-home estimates) plus a $2,500 pass-through deposit that the City bills its consultants' review costs against and refunds any balance of; pools ($50 plus a pass-through deposit), accessory structures ($50), fences and walls ($50), signs ($100 plus a $750 deposit) and boat docks ($350 plus a $2,500 deposit) carry their own City fees. Orange County's zoning review fees are included in estimates as a precaution, but the City does its own zoning review, so ask the county whether they are charged inside Edgewood. See the Orange County fee schedule

Orange County, which issues Edgewood's building permits, adopted new building permit fees (Resolution 2026-M-39) and Fire Rescue fees (Resolution 2026-M-38) on July 16, 2026, taking effect October 1, 2026, or as soon afterward as practical. Estimates on this page use the new rates, including the new private provider percentages; permits issued before the change are charged the prior rates. See the official notice

In Edgewood, a building permit for a $50,000 remodel runs $259.55 in permit fees, a $20,000 re-roof $125.00, a $10,000 HVAC change-out $42.00, a $10,000 electrical panel upgrade or rewire $141.00, and a $10,000 whole-house repipe $42.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Orange County Fee Directory, Fiscal Year 2025–2026, as amended by Resolutions 2026-M-38 and 2026-M-39 (adopted July 16, 2026; new rates effective October 1, 2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Orange County's Division of Building Safety issues, inspects, and charges building, electrical, plumbing, mechanical, and roofing permits in Edgewood at the same rates as unincorporated Orange County under the City's interlocal agreement (approved 2005, extended in 2020), so the county's fee schedule applies here. Apply to the City first for zoning review: a new single-family home pays the City's $500 application fee (included in new-home estimates) plus a $2,500 pass-through deposit that the City bills its consultants' review costs against and refunds any balance of; pools ($50 plus a pass-through deposit), accessory structures ($50), fences and walls ($50), signs ($100 plus a $750 deposit) and boat docks ($350 plus a $2,500 deposit) carry their own City fees. Orange County's zoning review fees are included in estimates as a precaution, but the City does its own zoning review, so ask the county whether they are charged inside Edgewood. See the Orange County fee schedule

How Edgewood values a job: Orange County values construction at its per-square-foot occupancy/construction-type table (Fee Directory pp. 28–33) × square footage, or your contract valuation if greater. If the county’s valuation exceeds your contract price, the actual fee will be higher than this estimate.

Schedules effective July 1, 2025 – October 1, 2026. Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Edgewood Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Edgewood

Residential (1–2 family)
$26.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof
Residential (1–2 family): Roof permit on new dwelling only
$38.00 flat
Commercial / 3+ units
$26.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof
Commercial / 3+ units: Roof permit – new commercial/multifamily construction
$54.00 for the first $1,000, plus $5.00 per additional $1,000 of job value or fraction thereof
State Building Permit Surcharges (F.S. 553.721 + 468.631, combined)
2.5% of the permit fee, minimum $4.00
Orange County – Private Provider Reduction, Inspections Only (F.S. 553.791), Roofing (select fee rules only)
permit fee charged at 75% of the calculated fee (reduced fee no less than $26.00)†
Printed as the fee paid: 75% of the permit fee with a private provider for plan review or inspections, never below the stated minimum
Orange County – Private Provider Reduction, Inspections Only (F.S. 553.791), Roofing (new commercial roof permit) (select fee rules only)
permit fee charged at 75% of the calculated fee (reduced fee no less than $54.00)†
Printed as the fee paid: 75% of the permit fee with a private provider for plan review or inspections, never below the stated minimum
Orange County – Private Provider Reduction, Plan Review and Inspections (F.S. 553.791), Roofing (select fee rules only)
permit fee charged at 50% of the calculated fee (reduced fee no less than $26.00)†
Printed as the fee paid: 50% of the permit fee with a private provider for plan review and inspections, never below the stated minimum
Orange County – Private Provider Reduction, Plan Review and Inspections (F.S. 553.791), Roofing (new commercial roof permit) (select fee rules only)
permit fee charged at 50% of the calculated fee (reduced fee no less than $54.00)†
Printed as the fee paid: 50% of the permit fee with a private provider for plan review and inspections, never below the stated minimum
Orange County – Private Provider Reduction, Plan Review Only (F.S. 553.791), Roofing (select fee rules only)
permit fee charged at 75% of the calculated fee (reduced fee no less than $26.00)†
Printed as the fee paid: 75% of the permit fee with a private provider for plan review or inspections, never below the stated minimum
Orange County – Private Provider Reduction, Plan Review Only (F.S. 553.791), Roofing (new commercial roof permit) (select fee rules only)
permit fee charged at 75% of the calculated fee (reduced fee no less than $54.00)†
Printed as the fee paid: 75% of the permit fee with a private provider for plan review or inspections, never below the stated minimum

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Roofer in Edgewood

Homeowners and contractors planning a project check Edgewood roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Edgewood Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

$
$500$100,000
Estimated roofing permit fee
$125.00
Included in this total
Roofing Permit Fee$121.00
$26.00 for the first $1,000 + 19 × $5.00 per additional $1,000
State Building Permit Surcharges (F.S. 553.721 + 468.631, Combined)$4.00
Total Estimate$125.00

Orange County, which issues Edgewood's building permits, adopted new building permit fees (Resolution 2026-M-39) and Fire Rescue fees (Resolution 2026-M-38) on July 16, 2026, taking effect October 1, 2026, or as soon afterward as practical. Estimates on this page use the new rates, including the new private provider percentages; permits issued before the change are charged the prior rates. See the official notice

Orange County values construction at its per-square-foot occupancy/construction-type table (Fee Directory pp. 28–33) × square footage, or your contract valuation if greater. If the county’s valuation exceeds your contract price, the actual fee will be higher than this estimate.

Permit fees for Edgewood are administered by Orange County; the fees shown are the Orange County schedule.

Estimate only. Confirm with the Orange County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Edgewood

Homeowners and contractors planning a project check Edgewood roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Edgewood Permit Fee FAQs

How Much Does a Building Permit Cost in Edgewood?

The building permit for a $50,000 residential remodel runs $259.55, including the documented surcharges and minimum fees. The estimate is built from Edgewood's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Edgewood?

The roofing permit for a $20,000 residential re-roof runs $125.00, based on Edgewood's sourced fee schedule.

How Are Permit Fees Calculated in Edgewood?

A residential building permit is $26.00 for the first $1,000, then tiered rates by job value. Electrical and Roofing permits scale with the value of the job; Plumbing permits are flat fees for the default job (Re-pipe, residential), while other work is priced per fixture; Mechanical / HVAC permits are priced per ton. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Edgewood?

On top of the base permit fee, the sourced schedule adds State Building Permit Surcharges (F.S. 553.721 + 468.631, combined) (2.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Edgewood?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Orange County Fee Directory, Fiscal Year 2025–2026, as amended by Resolutions 2026-M-38 and 2026-M-39 (adopted July 16, 2026; new rates effective October 1, 2026). See the official schedule. Last verified .

Other Jurisdictions in Orange County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.