FreeEvery fee straight from the official city and county fee schedules. No signup.

Maitland, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Maitland, straight from the official fee schedule, with a free permit fee calculator below.

Maitland prices general building permits by square footage times the ICC valuation chart times a city fee multiplier that the city has not published, so we cannot estimate a general building permit here. Stand-alone trade permits are printed flat fees and are estimated in full. The city's own online fee estimator can price a building permit before you apply. See the official notice

In Maitland, a $20,000 re-roof runs $305.00 in permit fees, a $10,000 HVAC change-out $179.00, a $10,000 electrical panel upgrade or rewire $381.88, and a $10,000 whole-house repipe $254.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Maitland Building and Permitting Fees (Res. 07-2026, adopted June 22, 2026, effective July 1, 2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Maitland permit portal, or call 407-539-6150.

How Maitland values a job: Maitland bases building permit valuations on the current ICC valuation tables, rounded up to the next $1,000; stand-alone electrical, plumbing, mechanical, and roofing permits are charged as flat fees. The general building permit fee itself is square footage times that chart times a Building Fee Multiplier the city has not published.

Schedule effective July 1, 2026. Last verified: September 27, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Maitland Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Maitland

Residential (1–2 family): Reroof
$200.00 flat
Commercial / 3+ units: Reroof
$800.00 flat
Permit Processing Fee
$100.00
Reinspection Fee
$50.00 per inspection
State Building Permit Surcharges (F.S. 553.721 + 468.631, combined)
2.5% of the permit fee, minimum $4.00
Permit Renewal or Reinstatement (if applicable)
$150.00
Plan Review Revision Fee (if applicable)
$50.00
Sponsor This Page
Be the Featured Roofer in Maitland

Homeowners and contractors planning a project check Maitland roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Maitland Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated roofing permit fee
$305.00
Included in this total
Roofing Permit Fee$200.00
$200.00 flat
Permit Processing Fee$100.00
State Building Permit Surcharges (F.S. 553.721 + 468.631, Combined)$5.00
Total Estimate$305.00
Not included in this total
Reinspection Fee$50.00 / inspection
Charged per inspection; depends on your project's number of inspections.

Maitland prices general building permits by square footage times the ICC valuation chart times a city fee multiplier that the city has not published, so we cannot estimate a general building permit here. Stand-alone trade permits are printed flat fees and are estimated in full. The city's own online fee estimator can price a building permit before you apply. See the official notice

Estimate only. Confirm with the Maitland building department before applying. Apply online. Phone: 407-539-6150. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Maitland

Homeowners and contractors planning a project check Maitland roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Maitland

Maitland takes permit applications online through its Energov Self Service portal, run by the Community Development Department. Create an account, apply under Permits, and upload your plans and checklists; the portal walks you through the required files, lets you estimate fees before applying, and handles payment, status tracking, permit cards, inspection requests and inspection results. Plans must be flat PDFs, right side up, under 50 MB, with filenames of 30 characters or less and no spaces or special characters, and each sheet needs an empty 2.5 inch square in the top right corner for the approval stamp. Drawings from a design professional need a digital signature and seal, or file a Professional Signature Submittal form and deliver wet sealed documents after review. Contractors must have current registration on file with the city. Inspections requested before 5 p.m. are conducted the next day, except site construction, fire and right of way permits. Once every inspection has passed, contact the Building Official for a certificate of occupancy or completion. If you are not sure which permit you need, call a permit specialist at 407-539-6150.

Source: Maitland application instructions

Apply online: Maitland permit portal
Building Department Contact
Address
1776 Independence Lane, Maitland, FL 32751
Hours
7 a.m. to 6 p.m. Monday through Thursday

Maitland Permit Fee FAQs

How Much Does a Roofing Permit Cost in Maitland?

The roofing permit for a $20,000 residential re-roof runs $305.00, based on Maitland's sourced fee schedule.

How Are Permit Fees Calculated in Maitland?

Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Maitland?

On top of the base permit fee, the sourced schedule adds State Building Permit Surcharges (F.S. 553.721 + 468.631, combined) (2.5% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Maitland?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Maitland Building and Permitting Fees (Res. 07-2026, adopted June 22, 2026, effective July 1, 2026). See the official schedule. Last verified .

Other Jurisdictions in Orange County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.