Oakland, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Oakland, straight from the official fee schedule, with a free permit fee calculator below.
In Oakland, a building permit for a $50,000 remodel runs $790.63 in permit fees, a $20,000 re-roof $154.25, a $10,000 HVAC change-out $205.00, a $10,000 electrical panel upgrade or rewire $154.25, and a $10,000 whole-house repipe $154.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution No. 2025-03, Town of Oakland Building Fee Schedule (Exhibit A), adopted Jan. 28, 2025
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Call the building department at 689-229-9974.
How Oakland values a job: Construction value is based on the ICC "Building Valuation Data" chart (published in the Building Safety Journal) or the contracted price, whichever is greater.
Schedule effective January 28, 2025. Last verified: September 27, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Oakland Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Oakland
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Oakland building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageOakland Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Oakland are the same either way.
15 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Construction value is based on the ICC "Building Valuation Data" chart (published in the Building Safety Journal) or the contracted price, whichever is greater.
Estimate only. Confirm with the Oakland building department before applying. Phone: 689-229-9974. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Oakland building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Oakland
The Town of Oakland contracts its building and permitting services to Willdan Engineering, Inc. The Willdan staff works offsite, so applications and questions go by email; there is no online permit portal. All building permit applications are submitted electronically: email the completed Oakland Building Permit Application (one form covers all work types) with your plans and supporting documents to oaklandfl@willdan.com. Contractors must also file a Contractor Registration Form. Owner builders sign the Owner-Builder Affidavit in front of Town staff at Town Hall during business hours, then email the notarized document to Willdan. Fees are paid to the Town of Oakland, not Willdan: by card over the phone at 407-656-1117 or in person at 230 North Tubb Street (card processing fee applies), or by check to P.O. Box 98, Oakland, FL 34760. Some projects generate separate invoices payable to the City of Winter Garden, the City of Clermont, or Orange County Public Schools. To schedule an inspection, email Oaklandinspections@Willdan.com with the permit number, site address, inspection type, and the day and time requested. Oakland enforces the 8th Edition (2023) Florida Building Code.
Source: Oakland application instructions
- Phone
- 689-229-9974 (Willdan building and permit department, leave a message)
- Phone
- 407-656-1117 (Town of Oakland, fee payment and general)
- oaklandfl@willdan.com (permit submittals and questions)
- Oaklandinspections@Willdan.com (inspection scheduling)
- Address
- Town of Oakland Administration Building, 230 North Tubb Street, Oakland, FL 34760
- Hours
- Monday through Friday, 8:00 AM to 5:00 PM
- Source
- Official contact page
Oakland Permit Fee FAQs
How Much Does a Building Permit Cost in Oakland?
How Much Does a Roofing Permit Cost in Oakland?
How Are Permit Fees Calculated in Oakland?
What Surcharges Are Added to Permits in Oakland?
Do I Need a Permit for a Small Residential Job in Oakland?
Where Do These Fees Come From?
Other Jurisdictions in Orange County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.