Building Permit Fees in Oakland, FL (2026)
In Oakland, a $50,000 kitchen remodel runs about $625.00 in permit fees, a $15,000 re-roof about $150.00, an $8,000 HVAC change-out about $200.00, a $12,000 electrical panel upgrade or rewire about $150.00, an $8,000 whole-house repipe about $150.00, and a new $350,000 single-family home about $4,375.00. Totals include the documented surcharges and minimum fees — pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from Resolution No. 2025-03 — Town of Oakland Building Fee Schedule (Exhibit A), adopted Jan. 28, 2025, last verified July 19, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
Resolution No. 2025-03 — Town of Oakland Building Fee Schedule (Exhibit A), adopted Jan. 28, 2025
Schedule effective January 28, 2025. Last verified: July 19, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Oakland are the same either way.
Estimate only. Confirm with the Oakland building department before applying.