Building Permit Fees in Orlando, FL (2026)
In Orlando, a $50,000 kitchen remodel runs about $311.97 in permit fees, a $15,000 re-roof about $135.82, an $8,000 HVAC change-out about $151.90, a $12,000 electrical panel upgrade or rewire about $198.01, an $8,000 whole-house repipe about $180.95, and a new $350,000 single-family home about $1,773.89. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of Orlando Permitting Development Fees – Commercial & Residential (Effective January 2026), last verified July 18, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
City of Orlando Permitting Development Fees – Commercial & Residential (Effective January 2026)
Schedule effective January 1, 2026. Last verified: July 18, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Orlando are the same either way.
Estimate only. Confirm with the Orlando building department before applying.