Building Permit Fees in Orlando, FL (2026)
In Orlando, a $50,000 kitchen remodel runs about $311.97 in permit fees, a $15,000 re-roof about $135.82, an $8,000 HVAC change-out about $151.90, a $12,000 electrical panel upgrade or rewire about $198.01, an $8,000 whole-house repipe about $180.95, and a new $350,000 single-family home about $1,773.89. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of Orlando Permitting Development Fees – Commercial & Residential (Effective January 2026), last verified July 18, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
City of Orlando Permitting Development Fees – Commercial & Residential (Effective January 2026)
Schedule effective January 1, 2026. Last verified: July 18, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Orlando are the same either way.
Orlando bases permit fees on the ICC “Building Valuation Data” chart or your contracted price, whichever is greater — if the ICC valuation exceeds your contract price, the actual fee will be higher than this estimate.
Estimate only. Confirm with the Orlando building department before applying.