Building Permit Fees in Windermere, FL (2026)

In Windermere, a $50,000 kitchen remodel runs about $512.50 in permit fees, a $15,000 re-roof about $154.25, an $8,000 HVAC change-out about $79.00, a $12,000 electrical panel upgrade or rewire about $79.00, an $8,000 whole-house repipe about $79.00, and a new $350,000 single-family home about $3,587.50. Totals include the documented surcharges and minimum fees — pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from PDCS Windermere Building Fee Schedule ("Fee by Group"), source file Windermere Master Rec.xls dated 2024-06-18, last verified July 19, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Residential (1–2 family)
$150.00 flat
FL Building Code Surcharge – BCAIB/DBPR (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Code Surcharge – DCA/Florida Building Commission (F.S. 553.721)
1% of the permit fee, minimum $2.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Source

PDCS Windermere Building Fee Schedule ("Fee by Group"), source file Windermere Master Rec.xls dated 2024-06-18

Schedule effective June 18, 2024. Last verified: July 19, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Windermere are the same either way.

Estimated roofing permit fee
$154.25
Roofing permit fee$150.00
$150.00 flat
FL Building Code Surcharge – BCAIB/DBPR (F.S. 468.631)$2.25
See the companion F.S. 553.721 add-on's note: the two statutory permit-fee surcharges (1% + 1.5%, $2 min each) exactly reproduce every printed Surcharge/BCA amount ($4.00/$4.25/$6.25) and Group IV's "2.5%". Loaded 2026-07-19 review, replacing the mis-based 2.5%-of-job-value add-on.
FL Building Code Surcharge – DCA/Florida Building Commission (F.S. 553.721)$2.00
Replaces the 2026-07-19 overnight load's four per-group Surcharge/BCA add-ons (review 2026-07-19). The source's printed per-group surcharge amounts are exactly reproduced by the two FL statutory surcharges computed on the permit fee with $2 minimums each: $75 fee → $2+$2=$4.00; $150 → $2+$2.25=$4.25; $250 → $2.50+$3.75=$6.25; $40 low-voltage → $4.00; Group IV prints the general form "2.5%" (of the permit fee, i.e. this 1% + the 1.5% BCAIB line). Group IV row totals print "Please Contact PDCS", so no value-based total exists. corroborated (not verified) because the PDF prints the amounts but not the statutory basis.
Total estimate$154.25

Estimate only. Confirm with the Windermere building department before applying.

Other jurisdictions in Orange County