Building Permit Fees in Winter Garden, FL (2026)
In Winter Garden, a building permit for a $50,000 remodel runs $338.25 in permit fees, a $20,000 re-roof $153.24, a $10,000 HVAC change-out $88.00, a $10,000 electrical panel upgrade or rewire $88.00, and a $10,000 whole-house repipe $88.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Winter Garden Permit Fee Schedule (Updated 2/24/2024)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $30.00.
How Winter Garden values a job: Winter Garden charges on total construction value; new single-family homes are valued at total square footage × $165.67 (ICC). If the city’s valuation exceeds your contract price, the actual fee will be higher than this estimate.
Schedule effective February 24, 2024. Last verified: July 17, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Winter Garden Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Winter Garden
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Winter Garden building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageWinter Garden Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Winter Garden charges on total construction value; new single-family homes are valued at total square footage × $165.67 (ICC). If the city’s valuation exceeds your contract price, the actual fee will be higher than this estimate.
Estimate only. Confirm with the Winter Garden building department before applying.
Homeowners and contractors planning a project check Winter Garden building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageWinter Garden Permit Fee FAQs
How Much Is a Building Permit in Winter Garden?
How Much Is a Roofing Permit in Winter Garden?
How Are Permit Fees Calculated in Winter Garden?
What Is the Minimum Permit Fee in Winter Garden?
What Surcharges Are Added to Permits in Winter Garden?
Do I Need a Permit for a Small Residential Job in Winter Garden?
Where Do These Fees Come From?
Compare Permit Fees Across Orange County
The same job, priced by each jurisdiction's own fee schedule. Across Orange County's 12 covered jurisdictions, a building permit for a $50,000 remodel runs from $177.33 (Unincorporated Orange County) to $896.88 (Maitland).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Orange County | $177.33 | $125.00 |
| Apopka | $571.88 | $154.25 |
| Bay Lake | $473.90 | $251.22 |
| Belle Isle | $732.50 | $390.00 |
| Lake Buena Vista | $473.90 | $251.22 |
| Maitland | $896.88 | $358.75 |
| Oakland | $640.63 | $154.25 |
| Ocoee | $457.50 | $54.00 |
| Orlando | $311.97 | $158.78 |
| Windermere | $512.50 | $169.25 |
| Winter Garden | $338.25 | $153.24 |
| Winter Park | $589.25 | $238.70 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.