Kissimmee, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Kissimmee, straight from the official fee schedule, with a free permit fee calculator below.
Kissimmee adjusts these fees every October 1 by the CPI-U under Resolution 24-2025. Figures shown are the schedule effective November 1, 2025; the October 2026 adjustment may not yet be reflected. See the official notice
In Kissimmee, a building permit for a $50,000 remodel runs $1,510.19 in permit fees, a $20,000 re-roof $618.61, a $10,000 HVAC change-out $133.90, a $10,000 electrical panel upgrade or rewire $133.90, and a $10,000 whole-house repipe $133.90. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution 24-2025 Exhibit A: Fees for Building, Mechanical, Plumbing and Electrical Permits (effective November 1, 2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Kissimmee values a job: Kissimmee bases valuation fees on construction value including labor, determined from the most recent ICC building valuation data; the city's valuation may differ from your contract price.
Schedule effective November 1, 2025. Last verified: September 19, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Kissimmee Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in Kissimmee
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Kissimmee mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKissimmee Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Kissimmee adjusts these fees every October 1 by the CPI-U under Resolution 24-2025. Figures shown are the schedule effective November 1, 2025; the October 2026 adjustment may not yet be reflected. See the official notice
Estimate only. Confirm with the Kissimmee building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Kissimmee mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKissimmee Permit Fee FAQs
How Much Does a Building Permit Cost in Kissimmee?
How Much Does a Roofing Permit Cost in Kissimmee?
How Are Permit Fees Calculated in Kissimmee?
What Surcharges Are Added to Permits in Kissimmee?
Do I Need a Permit for a Small Residential Job in Kissimmee?
Where Do These Fees Come From?
Other Jurisdictions in Osceola County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.