FreeEvery fee straight from the official city and county fee schedules. No signup.

Jay, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Jay, straight from the official fee schedule, with a free permit fee calculator below.

Building, electrical, plumbing, mechanical, and roofing permits within the Town of Jay are issued and administered by Santa Rosa County Development Services, per the county's own permit-application process covering Milton, Gulf Breeze, and Jay, so Jay's permit fees follow Santa Rosa County's fee schedule. The Town's own prior approval is required before applying, and any Town charge for that approval is not published. See the Santa Rosa County fee schedule

In Jay, a building permit for a $50,000 remodel runs $265.92 in permit fees, a $20,000 re-roof $190.28, a $10,000 HVAC change-out $106.00, a $10,000 electrical panel upgrade or rewire $106.00, and a $10,000 whole-house repipe $139.50. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Santa Rosa County, FL - Resolution No. 2025-29 (Development Services Fee Schedule, OR BK 4657 Pg 1706-1710, adopted 9/11/2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Building, electrical, plumbing, mechanical, and roofing permits within the Town of Jay are issued and administered by Santa Rosa County Development Services, per the county's own permit-application process covering Milton, Gulf Breeze, and Jay, so Jay's permit fees follow Santa Rosa County's fee schedule. The Town's own prior approval is required before applying, and any Town charge for that approval is not published. See the Santa Rosa County fee schedule

Schedule effective October 1, 2024. Last verified: September 6, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Jay Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Jay

Residential (1–2 family): Up to 800 amp
$67.00 flat
Residential (1–2 family): Over 800 amp
$150.00 flat
Commercial / 3+ units: Up to 800 amp
$133.00 flat
Commercial / 3+ units: Over 800 amp
$300.00 flat
Santa Rosa County - Administrative Fee (Commercial/All Other)
$55.00
Santa Rosa County - Administrative Fee (Residential)
$35.00
Santa Rosa County - State Surcharge
3% of the permit fee, minimum $4.00
Santa Rosa County - Plan Check Fee (Plans Submitted Separately) (if applicable)
62.9% of the permit fee
Sponsor This Page
Be the Featured Electrician in Jay

Homeowners and contractors planning a project check Jay electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Jay Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
Estimated electrical permit fee
$106.00
Electrical permit fee$67.00
$67.00 flat
Santa Rosa County - Administrative Fee (Residential)$35.00
Santa Rosa County - State Surcharge$4.00
Total Estimate$106.00

Permit fees for Jay are administered by Santa Rosa County; the fees shown are the Santa Rosa County schedule.

Estimate only. Confirm with the Santa Rosa County building department before applying.

Sponsor This Page
Be the Featured Electrician in Jay

Homeowners and contractors planning a project check Jay electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Jay Permit Fee FAQs

How Much Does a Building Permit Cost in Jay?

The building permit for a $50,000 residential remodel runs $265.92, including the documented surcharges and minimum fees. The estimate is built from Jay's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Jay?

The roofing permit for a $20,000 residential re-roof runs $190.28, based on Jay's sourced fee schedule.

How Are Permit Fees Calculated in Jay?

A residential building permit is tiered rates (see fee table). Electrical, Mechanical / HVAC, and Roofing permits are flat fees; Plumbing permits are priced per fixture. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Jay?

On top of the base permit fee, the sourced schedule adds Santa Rosa County - Building Plan Check and Re-submittal Fee (62.9% of the permit fee), Santa Rosa County - Life Safety Fee (Final Inspection) - Residential (62.9% of the permit fee) and Santa Rosa County - State Surcharge (3% of the permit fee, minimum $4.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Jay?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Santa Rosa County, FL - Resolution No. 2025-29 (Development Services Fee Schedule, OR BK 4657 Pg 1706-1710, adopted 9/11/2025). See the official schedule. Last verified .

Other Jurisdictions in Santa Rosa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.