Building Permit Fees in Daytona Beach, FL (2026)
Daytona Beach is waiving permit and inspection fees for residential and commercial projects from March 19 through September 10, 2026 (the city's sixth waiver since 2020). The city's notice describes eligible projects with an illustrative list (new construction, interior renovations, roof replacements, electrical and fire suppression upgrades, and improvements such as fences, doors, windows, and air conditioning units) and publishes no exclusions, but eligibility is the city's determination and charges other than permit and inspection fees are not addressed. The fees shown here are the adopted schedule, which applies to ineligible projects and returns for everyone after September 10, 2026. Confirm your project's eligibility with Permits and Licensing (386-671-8140) before budgeting. See the official notice
In Daytona Beach, a building permit for a $50,000 remodel runs $554.90 in permit fees, a $20,000 re-roof $145.22, a $10,000 HVAC change-out $145.22, and a $10,000 whole-house repipe $190.18. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Daytona Beach 2025-2026 Fee Schedule
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Daytona Beach values a job: Chargeable valuation is the value/cost of work self-declared by the applicant on the Building Permit Application (separate "Valuation" fields for Building, Electrical, Plumbing, Mechanical, and Roofing); the city's published fee schedule does not reference ICC valuation tables or another formula.
Schedule effective October 1, 2025. Last verified: July 22, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Daytona Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in Daytona Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Daytona Beach plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDaytona Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Daytona Beach is waiving permit and inspection fees for residential and commercial projects from March 19 through September 10, 2026 (the city's sixth waiver since 2020). The city's notice describes eligible projects with an illustrative list (new construction, interior renovations, roof replacements, electrical and fire suppression upgrades, and improvements such as fences, doors, windows, and air conditioning units) and publishes no exclusions, but eligibility is the city's determination and charges other than permit and inspection fees are not addressed. The fees shown here are the adopted schedule, which applies to ineligible projects and returns for everyone after September 10, 2026. Confirm your project's eligibility with Permits and Licensing (386-671-8140) before budgeting. See the official notice
Estimate only. Confirm with the Daytona Beach building department before applying.
Homeowners and contractors planning a project check Daytona Beach plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDaytona Beach Permit Fee FAQs
How Much Is a Building Permit in Daytona Beach?
How Much Is a Roofing Permit in Daytona Beach?
How Are Permit Fees Calculated in Daytona Beach?
What Surcharges Are Added to Permits in Daytona Beach?
Do I Need a Permit for a Small Residential Job in Daytona Beach?
Where Do These Fees Come From?
Compare Permit Fees Across Volusia County
The same job, priced by each jurisdiction's own fee schedule. Across Volusia County's 13 covered jurisdictions, a building permit for a $50,000 remodel runs from $256.13 (Deltona) to $699.26 (New Smyrna Beach).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Volusia County | $470.60 | $203.13 |
| Daytona Beach | $554.90 | $145.22 |
| DeLand | $630.47 | $216.50 |
| Deltona | $256.13 | $81.00 |
| Edgewater | $500.00 | $115.10 |
| Holly Hill | $381.38 | n/a |
| Lake Helen | $470.60 | $203.13 |
| New Smyrna Beach | $699.26 | $91.90 |
| Orange City | $378.00 | $79.00 |
| Ormond Beach | $458.36 | $170.25 |
| Ponce Inlet | $487.50 | $209.00 |
| Port Orange | $491.88 | $134.00 |
| South Daytona | $583.95 | n/a |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.