Bonney, TX Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Bonney, straight from the official fee schedule, with a free permit fee calculator below.
Commercial building and commercial reroof permits over $1,000,000 are not estimated here: the Village's printed base for that band does not follow from the band below it. The Village may also require a deposit toward its actual engineering, legal, recording and other costs on any permit, in an amount the Mayor sets; that deposit is not included.
In Bonney, a building permit for a remodel runs $120.00 in permit fees, a $10,000 HVAC change-out $575.00, a $10,000 electrical panel upgrade or rewire $575.00, and a $10,000 whole-house repipe $575.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorVillage of Bonney Ordinance No. 8-2025 and Development Fee Schedule (September 16, 2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Call the building department at (281) 595-2269.
How Bonney values a job: Commercial construction valuation is based on the International Code Council building valuation tables as of August 2014, per the Village fee schedule.
Schedule effective September 16, 2025. Last verified: November 3, 2026
Bonney Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Bonney
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Bonney building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBonney Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Bonney are the same either way.
5 documented rates for this permit type; pick the one that matches your job.
Commercial building and commercial reroof permits over $1,000,000 are not estimated here: the Village's printed base for that band does not follow from the band below it. The Village may also require a deposit toward its actual engineering, legal, recording and other costs on any permit, in an amount the Mayor sets; that deposit is not included.
Estimate only. Confirm with the Bonney building department before applying. Phone: (281) 595-2269. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Bonney building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Bonney
Download the Village of Bonney Building Permit Application (revised April 22, 2026) from the Village's Permits and Inspections page, which also posts the contractor information form and the after-hours inspection application. The application asks for the project value and square footage and for three 11 x 17 inch paper copies and one 24 x 36 inch paper copy of the construction documents. Contractors also file the Contractor Information Form with copies of any applicable state licenses, a driver license and proof of general liability insurance naming the Village of Bonney as certificate holder. Applications are paper forms; the Village posts no online permit portal. The application lists the Village office at 19025 FM 521, Bonney, Texas 77583, phone 281-595-2269, email info@bonneytexas.gov. Permits expire after 180 days of inactivity, with one 180-day extension if requested before expiration. The owner of a commercial project over $50,000 must ensure it meets the Texas Accessibility Standards before construction starts.
Source: Bonney application instructions
- Phone
- (281) 595-2269
- info@bonneytexas.gov
- Address
- 19025 FM 521, Bonney, Texas 77583
- Hours
- Monday to Friday, 1 pm to 5 pm (Village office hours from October 1, 2026)
- Source
- Official contact page
Bonney Permit Fee FAQs
How Much Does a Building Permit Cost in Bonney?
How Are Permit Fees Calculated in Bonney?
What Surcharges Are Added to Permits in Bonney?
Where Do These Fees Come From?
Other Jurisdictions in Brazoria County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.