FreeEvery fee straight from the official city and county fee schedules. No signup.

Flower Mound, TX Permit Fees (2026)

Building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Flower Mound, straight from the official fee schedule, with a free permit fee calculator below.

In Flower Mound, a building permit for a $50,000 remodel runs $250.00 in permit fees, a $20,000 re-roof $220.00, a $10,000 HVAC change-out $180.00, a $10,000 electrical panel upgrade or rewire $100.00, and a $10,000 whole-house repipe $100.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Flower Mound Building Inspections Fee Schedule (Ordinance No. 36-26, effective October 1, 2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Flower Mound permit portal, or call 972.874.6355.

Schedule effective October 1, 2026. Last verified: November 20, 2026

Flower Mound Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Flower Mound

Residential (1–2 family): Residential remodel, no added floor area
$250.00 flat
Residential (1–2 family): New single-family home or duplex (by home size)
tiered rates by sq ft
Up to 2,000 sq ft
$1,700.00
Over 2,000, up to 2,500 sq ft
$1,870.00
Over 2,500, up to 3,000 sq ft
$2,050.00
Over 3,000, up to 4,000 sq ft
$2,210.00
Over 4,000, up to 5,000 sq ft
$2,500.00
Over 5,000, up to 7,500 sq ft
$3,510.00
Over 7,500, up to 10,000 sq ft
$4,200.00
Over 10,000 sq ft
$4,770.00
Residential (1–2 family): Residential remodel or addition that adds floor area (by added sq ft)
tiered rates by sq ft‡
Up to 500 sq ft
$550.00
Over 500, up to 1,000 sq ft
$740.00
Over 1,000, up to 1,500 sq ft
$1,050.00
Over 1,500, up to 2,000 sq ft
$1,230.00
Over 2,000, up to 2,500 sq ft
$1,870.00
Over 2,500, up to 3,000 sq ft
$2,050.00
Over 3,000, up to 4,000 sq ft
$2,210.00
Over 4,000, up to 5,000 sq ft
$2,500.00
Over 5,000, up to 7,500 sq ft
$3,510.00
Over 7,500, up to 10,000 sq ft
$4,200.00
Over 10,000 sq ft
$4,770.00
Commercial / 3+ units: Commercial tenant finish-out or shell building (75% of new commercial fee)
tiered rates by sq ft (75% of new fee; over 1,000 sq ft: $465 + $0.09 x total sq ft)‡
Up to 1,000 sq ft
$555.00
Over 1,000 sq ft
$555.00 plus $0.09 per additional sq ft
Commercial / 3+ units: New commercial building
tiered rates by sq ft (Over 1,000 sq ft: $620 + $0.12 x total sq ft)
Up to 1,000 sq ft
$740.00
Over 1,000 sq ft
$740.00 plus $0.12 per additional sq ft
Commercial / 3+ units: Storage racking permit
$310.00 flat
Commercial / 3+ units: New multifamily building, 3 or more attached units
$620.00 per dwelling unit
Accessory building
$120.00 flat

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Flower Mound

Homeowners and contractors planning a project check Flower Mound building permit fees here first.

One sponsor per trade, flat monthly rate.

Flower Mound Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

20 documented rates for this permit type; pick the one that matches your job.

Estimated building permit fee
$250.00
Included in this total
Building Permit Fee$250.00
$250.00 flat
Total Estimate$250.00
Paid when you apply, counts toward this total
Residential Remodel Plan Review Fee$120.00
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

Estimate only. Confirm with the Flower Mound building department before applying. Apply online. Phone: 972.874.6355. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Flower Mound

Homeowners and contractors planning a project check Flower Mound building permit fees here first.

One sponsor per trade, flat monthly rate.

How to Apply for a Permit in Flower Mound

Apply online through the Town's eTRAKiT portal: choose the permit type (for example Single Family Detached, Residential Remodel, HVAC Replacement, Reroof, Commercial Finish Out), submit the application and plans, and track review there. Inspections are also requested in eTRAKiT with your contractor login.

General, plumbing, mechanical, electrical and irrigation contractors must register with the Town before a permit can be issued. Permit and registration fees are non-refundable.

New homes pay a $370 plan review fee at submittal; commercial and multifamily plans pay a plan review fee of 65% of the building permit fee at submittal.

For questions call Building Inspections at 972.874.6355.

Source: Flower Mound application instructions

Apply online: Flower Mound permit portal
Building Department Contact
Address
2121 Cross Timbers Rd., Flower Mound, TX 75028
Hours
8 a.m. to 5 p.m.
Sponsor This Spot · Permit Help
Be the Featured Permit Expediter in Denton County

Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.

One expediter per county.

Flower Mound Permit Fee FAQs

How Much Does a Building Permit Cost in Flower Mound?

The building permit for a $50,000 residential remodel runs $250.00, including the documented surcharges and minimum fees. The estimate is built from Flower Mound's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Flower Mound?

The roofing permit for a $20,000 residential re-roof runs $220.00, based on Flower Mound's sourced fee schedule.

How Are Permit Fees Calculated in Flower Mound?

A residential building permit is $250.00 flat. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Flower Mound?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (Commercial and Multifamily) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Flower Mound Building Inspections Fee Schedule (Ordinance No. 36-26, effective October 1, 2026). See the official schedule. Last verified .

Other Jurisdictions in Denton County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.