Flower Mound, TX Permit Fees (2026)
Building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Flower Mound, straight from the official fee schedule, with a free permit fee calculator below.
In Flower Mound, a building permit for a $50,000 remodel runs $250.00 in permit fees, a $20,000 re-roof $220.00, a $10,000 HVAC change-out $180.00, a $10,000 electrical panel upgrade or rewire $100.00, and a $10,000 whole-house repipe $100.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Flower Mound Building Inspections Fee Schedule (Ordinance No. 36-26, effective October 1, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Flower Mound permit portal, or call 972.874.6355.
Schedule effective October 1, 2026. Last verified: November 20, 2026
Flower Mound Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Flower Mound
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Flower Mound building permit fees here first.
One sponsor per trade, flat monthly rate.
Flower Mound Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
20 documented rates for this permit type; pick the one that matches your job.
Estimate only. Confirm with the Flower Mound building department before applying. Apply online. Phone: 972.874.6355. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Flower Mound building permit fees here first.
One sponsor per trade, flat monthly rate.
How to Apply for a Permit in Flower Mound
Apply online through the Town's eTRAKiT portal: choose the permit type (for example Single Family Detached, Residential Remodel, HVAC Replacement, Reroof, Commercial Finish Out), submit the application and plans, and track review there. Inspections are also requested in eTRAKiT with your contractor login.
General, plumbing, mechanical, electrical and irrigation contractors must register with the Town before a permit can be issued. Permit and registration fees are non-refundable.
New homes pay a $370 plan review fee at submittal; commercial and multifamily plans pay a plan review fee of 65% of the building permit fee at submittal.
For questions call Building Inspections at 972.874.6355.
Source: Flower Mound application instructions
Apply online: Flower Mound permit portal- Phone
- 972.874.6355
- Address
- 2121 Cross Timbers Rd., Flower Mound, TX 75028
- Hours
- 8 a.m. to 5 p.m.
- Source
- Official contact page
Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.
One expediter per county.
Flower Mound Permit Fee FAQs
How Much Does a Building Permit Cost in Flower Mound?
How Much Does a Roofing Permit Cost in Flower Mound?
How Are Permit Fees Calculated in Flower Mound?
What Surcharges Are Added to Permits in Flower Mound?
Where Do These Fees Come From?
Other Jurisdictions in Denton County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.