FreeEvery fee straight from the official city and county fee schedules. No signup.

Gila Bend, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Gila Bend, straight from the official fee schedule, with a free permit fee calculator below.

In Gila Bend, a building permit for a $50,000 remodel runs $1,299.18 in permit fees, a $20,000 re-roof $334.17, a $10,000 HVAC change-out $320.38, a $10,000 electrical panel upgrade or rewire $320.38, and a $10,000 whole-house repipe $320.38. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Gila Bend Fee Schedule FY 2016-2017 (last amended 11/22/2016; Council packet 3/26/2024)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Call the building department at (928) 235-6362.

How Gila Bend values a job: The Town's fee schedule calculates valuations from square-foot construction costs as outlined in the 2006 International Building Code.

Last verified: October 13, 2026

Gila Bend Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Gila Bend

Electrical permit (priced on the building valuation table)
tiered rates by job value‡
Each band uses its own printed base, which does not continue the band below: at $2,001 the base is $82.17 (the band below reaches $78.95), at $25,001 $486.13 ($404.17), at $50,001 $770.38 ($787.38), at $100,001 $1,188.88 ($1,170.38), at $500,001 $3,868.38 ($3,908.88), and above $1,000,000 $5,608.75 ($6,808.38).
Up to $500
$26.00
Over $500, up to $2,000
$26.00 plus $3.53 per additional $100
Over $2,000, up to $25,000
$82.17 plus $14.00 per additional $1,000
Over $25,000, up to $50,000
$486.13 plus $12.05 per additional $1,000
Over $50,000, up to $100,000
$770.38 plus $8.00 per additional $1,000
Over $100,000, up to $500,000
$1,188.88 plus $6.80 per additional $1,000
Over $500,000, up to $1,000,000
$3,868.38 plus $5.88 per additional $1,000
Over $1,000,000
$5,608.75 plus $3.65 per additional $1,000
Temporary electric power
$90.00 flat
Plan Review Fee (does not apply to some listed rules)
65% of the permit fee
Plan Review Fee (on set-fee permits) (select fee rules only)
65% of the permit fee‡
Re-inspection (per hour) (if applicable)
$75.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Gila Bend

Homeowners and contractors planning a project check Gila Bend electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Gila Bend Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Gila Bend are the same either way.

Job type

2 documented rates for this permit type; pick the one that matches your job.

$
$500$100,000
Estimated electrical permit fee
$320.38
Included in this total
Electrical Permit Fee$194.17‡
$82.17 + 8 × $14.00 per $1,000 over $2,000 (see the fee table above)
Each band uses its own printed base, which does not continue the band below: at $2,001 the base is $82.17 (the band below reaches $78.95), at $25,001 $486.13 ($404.17), at $50,001 $770.38 ($787.38), at $100,001 $1,188.88 ($1,170.38), at $500,001 $3,868.38 ($3,908.88), and above $1,000,000 $5,608.75 ($6,808.38).
Plan Review Fee$126.21
Total Estimate$320.38

‡ Awaiting confirmation from the jurisdiction.

The Town's fee schedule calculates valuations from square-foot construction costs as outlined in the 2006 International Building Code.

Estimate only. Confirm with the Gila Bend building department before applying. Phone: (928) 235-6362. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Gila Bend

Homeowners and contractors planning a project check Gila Bend electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Gila Bend

Gila Bend contracts building plan review, permitting, and inspections to Willdan Engineering. Send building permit questions and inspection requests to Willdan at BuildingSafetyAZ@willdan.com; the Town's Community and Economic Development office at 644 W. Pima St. (928-235-6362) can also direct you. The Town's website links no online permit portal.

Source: Gila Bend application instructions

Building Department Contact
Address
644 W. Pima St., Gila Bend, AZ 85337
Hours
Monday to Friday 8:00 am to 4:00 pm

Gila Bend Permit Fee FAQs

How Much Does a Building Permit Cost in Gila Bend?

The building permit for a $50,000 residential remodel runs $1,299.18, including the documented surcharges and minimum fees. The estimate is built from Gila Bend's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Gila Bend?

The roofing permit for a $20,000 residential re-roof runs $334.17, based on Gila Bend's sourced fee schedule.

How Are Permit Fees Calculated in Gila Bend?

A residential building permit is tiered rates by job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Gila Bend?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee) and Plan Review Fee (on set-fee permits) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Gila Bend Fee Schedule FY 2016-2017 (last amended 11/22/2016; Council packet 3/26/2024). See the official schedule. Last verified .

Other Jurisdictions in Maricopa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.