Glendale, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Glendale, straight from the official fee schedule, with a free permit fee calculator below.

In Glendale, a building permit for a $50,000 remodel runs $1,434.78 in permit fees, a $20,000 re-roof $415.96, a $10,000 HVAC change-out $39.79, a $10,000 electrical panel upgrade or rewire $39.79, and a whole-house repipe $216.49. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Glendale Community Development Fee Schedule (effective May 10, 2019), Building Safety

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Call the building department at 623-930-2800.

How Glendale values a job: Glendale values work at the estimated cost set by the Building Official from nationally recognized standards, including materials, labor, overhead, and profit, using the ICC Building Valuation Data and other valuation criteria the Building Official approves.

Schedule effective May 10, 2019. Last verified: October 9, 2026

Glendale Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Glendale

Residential (1–2 family): Residential heating, cooling, and ventilation work (base permit fee; equipment fees listed separately are added)
$29.79 flat‡
Commercial / 3+ units: Commercial heating, cooling, ventilation, and refrigeration work (base permit fee; equipment fees listed separately are added)
$59.01 flat, minimum $114.35‡
Record Retention Fee
1% of the permit fee, minimum $10.00‡
Air Handler, Less Than 10,000 CFM (each) (if applicable)
$13.48
Air Handler, More Than 10,000 CFM (each) (if applicable)
$22.60
Air Handlers (if applicable)
$13.48
All-in-One HVAC (if applicable)
$13.48
Appliance Vents (each) (if applicable)
$9.19
Appliance Vents (each) (if applicable)
$9.19
Boiler, Compressor, or Absorption System: 3 HP or 100K BTU/h or Less (each) (if applicable)
$18.38
Boiler, Compressor, or Absorption System: Over 15 HP to 30 HP, or Over 500K to Under 1,000,000 BTU/h (each) (if applicable)
$47.21
Boiler, Compressor, or Absorption System: Over 3 HP to 15 HP, or Over 100K to Under 500K BTU/h (each) (if applicable)
$34.38
Boiler, Compressor, or Absorption System: Over 30 HP to 50 HP, or 1,000,000 to Under 1,750,000 BTU/h (each) (if applicable)
$70.26
Boiler, Compressor, or Absorption System: Over 50 HP or Up to 1,750,000 BTU/h (each) (if applicable)
$117.42
Certificate of Occupancy, Tenant Space With No Work (if applicable)
$114.35
Chilled or Hot Water Piping (per 100 LF, 100 ft minimum) (if applicable)
$6.00
Compensation Air Circulation System (each) (if applicable)
$13.48
Evaporative Coolers (if applicable)
$13.48
Evaporative Coolers (each) (if applicable)
$13.48
Exhaust Hood, Type I (each) (if applicable)
$177.06
Exhaust Hood, Type II (each) (if applicable)
$13.48
Exhaust Hoods (if applicable)
$13.48
Floor Furnace (each) (if applicable)
$18.76
Furnace or Package Unit, 100K BTU or Less (each) (if applicable)
$18.76
Furnace or Package Unit, Over 100K BTU (each) (if applicable)
$23.04
Furnace, 100K BTU or Less (if applicable)
$18.76
Furnace, Over 100K BTU (if applicable)
$23.04
Heat Pump, Split System (each) (if applicable)
$32.24
Incinerators, Commercial and Industrial (each) (if applicable)
$18.38
Miscellaneous Equipment or Appliances (if applicable)
$13.48
Miscellaneous Equipment or Appliances (each) (if applicable)
$13.48
Permit Renewal After Expiration (if applicable)
100% of the permit fee
Permit Renewal Before Expiration (if applicable)
50% of the permit fee
Piggy-Back HVAC With Evaporative Cooler (each) (if applicable)
$32.24
Piggy-Backed HVAC (with evaporative cooler) (if applicable)
$32.24
Product Conveying Exhaust System (each) (if applicable)
$13.48
Refrigeration Condensers (each) (if applicable)
$13.48
Refrigeration Evaporators (each) (if applicable)
$13.48
Repairs or Additions to Existing Equipment (if applicable)
$17.35
Repairs or Additions to Existing Equipment (each) (if applicable)
$17.35
Suspended, Recessed, or Floor Mounted Heater (each) (if applicable)
$18.76
Temporary Certificate of Occupancy (first, up to 30 days) (if applicable)
$531.22
Temporary Certificate of Occupancy, First 30-Day Extension (if applicable)
$1,062.46
Temporary Certificate of Occupancy, Second 30-Day Extension (if applicable)
$2,124.94
Trade Plan Review Fee (electrical, plumbing, mechanical) (if applicable)
75% of the permit fee, minimum $122.88‡
Vent Fans (each) (if applicable)
$9.19
Vent or Exhaust Fan (each) (if applicable)
$9.19
Work Started Before Permit Issued (if applicable)
200% of the permit fee

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Glendale

Homeowners and contractors planning a project check Glendale mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Glendale Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Estimated mechanical / HVAC permit fee
$39.79
Included in this total
Mechanical / HVAC Permit Fee$29.79‡
$29.79 flat
Record Retention Fee$10.00‡
Total Estimate$39.79

‡ Awaiting confirmation from the jurisdiction.

Estimate only. Confirm with the Glendale building department before applying. Phone: 623-930-2800. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured HVAC Company in Glendale

Homeowners and contractors planning a project check Glendale mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Glendale

Glendale Development Services (Building Safety, Codes & Services) takes building permit applications by email only, for electronic plan review. Send the completed fillable permit application, sealed construction drawings, and any calculations or specifications as PDF files to permits@glendaleaz.com, or use the city's online upload pages for houses, pools, solar, and signs or banners. Written applications are not accepted. Single-family additions, accessory structures, and accessory dwelling units need a Zoning Clearance Letter from the Planning Division before you apply for the building permit. Plan review fees are due when you submit the application. There is no online permit portal. Call 623-930-2800 with questions.

Source: Glendale application instructions

Building Department Contact
Address
5850 W. Glendale Ave., Glendale, AZ 85301
Hours
Monday to Friday, 8 a.m. to 5 p.m. (counter assistance)

Glendale Permit Fee FAQs

How Much Does a Building Permit Cost in Glendale?

The building permit for a $50,000 residential remodel runs $1,434.78, including the documented surcharges and minimum fees. The estimate is built from Glendale's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Glendale?

The roofing permit for a $20,000 residential re-roof runs $415.96, based on Glendale's sourced fee schedule.

How Are Permit Fees Calculated in Glendale?

A residential building permit is $29.79 for the first $500, then tiered rates by job value. Electrical permits are flat fees for the default job (Residential electrical work, base permit fee; item fees listed separately are added), while new construction is priced per sq ft; Plumbing permits are priced per fixture; Mechanical / HVAC permits are flat fees; Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Glendale?

On top of the base permit fee, the sourced schedule adds Building Plan Review Fee (75% of the permit fee, minimum $122.88) and Record Retention Fee (1% of the permit fee, minimum $10.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Glendale Community Development Fee Schedule (effective May 10, 2019), Building Safety. See the official schedule. Last verified .

Other Jurisdictions in Maricopa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.