Tolleson, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Tolleson, straight from the official fee schedule, with a free permit fee calculator below.

In Tolleson, a building permit for a $50,000 remodel runs $952.05 in permit fees, a $20,000 re-roof $440.55, a $10,000 HVAC change-out $259.05, a $10,000 electrical panel upgrade or rewire $259.05, and a $10,000 whole-house repipe $259.05. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Tolleson Citywide Fee Schedule, Development Services (Res. 2595, effective April 25, 2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Tolleson permit portal, or call 623-936-7111.

How Tolleson values a job: Tolleson bases building permit fees on the cost of construction: building costs come from the city's building construction cost table by IBC usage group and type of construction, and other improvements use documented construction charges or a sealed cost estimate.

Schedule effective April 25, 2025. Last verified: October 9, 2026

Tolleson Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Tolleson

Mechanical and HVAC work (priced on the building valuation table)
tiered rates by job value‡
Up to $501
$24.00
Over $501, up to $2,001
$24.00 plus $3.00 per additional $100
Over $2,001, up to $40,001
$69.00 plus $11.00 per additional $1,000
Over $40,001, up to $100,001
$487.00 plus $9.00 per additional $1,000
Over $100,001, up to $500,001
$1,027.00 plus $7.00 per additional $1,000
Over $500,001, up to $1,000,001
$3,827.00 plus $5.00 per additional $1,000
Over $1,000,001
$6,327.00 plus $3.00 per additional $1,000
Plan Review Fee (trade permits)
65% of the permit fee‡
After-Hours Inspection (per hour, 4-hour minimum) (if applicable)
$70.50 per hour, minimum $282.00
Environmental Enhancement Fee (Commercial or Industrial) (if applicable)
$200.00‡
Collected at building permit issuance for parks, air quality and city quality-of-life programs, unless already paid at rezoning.
Environmental Enhancement Fee (Residential) (if applicable)
$100.00‡
Collected at building permit issuance for parks, air quality and city quality-of-life programs, unless already paid at rezoning.
New Certificate of Occupancy (if applicable)
$47.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Tolleson

Homeowners and contractors planning a project check Tolleson mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Tolleson Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Tolleson are the same either way.

$
$500$50,000
Estimated mechanical / HVAC permit fee
$259.05
Included in this total
Mechanical / HVAC Permit Fee$157.00‡
$69.00 + 8 × $11.00 per $1,000 over $2,001 (see the fee table above)
Plan Review Fee (Trade Permits)$102.05‡
Total Estimate$259.05

‡ Awaiting confirmation from the jurisdiction.

Tolleson bases building permit fees on the cost of construction: building costs come from the city's building construction cost table by IBC usage group and type of construction, and other improvements use documented construction charges or a sealed cost estimate.

Estimate only. Confirm with the Tolleson building department before applying. Apply online. Phone: 623-936-7111. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured HVAC Company in Tolleson

Homeowners and contractors planning a project check Tolleson mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Tolleson

Apply for permits, plans and licenses online through the city's Civic Access portal. The homeowner or a licensed contractor must apply for a building permit, and three sets of plans are required. Projects over $50,000 need a copy of the State of Arizona bonding certificate or waiver with the application. Work started without a permit can bring extra charges and fines. Questions go to Development Services at 623-936-7111.

Source: Tolleson application instructions

Apply online: Tolleson permit portal
Building Department Contact
Address
9055 W. Van Buren Street, Tolleson, AZ 85353
Hours
Monday to Thursday 7:30 AM to 6:00 PM, closed Friday to Sunday

Tolleson Permit Fee FAQs

How Much Does a Building Permit Cost in Tolleson?

The building permit for a $50,000 residential remodel runs $952.05, including the documented surcharges and minimum fees. The estimate is built from Tolleson's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Tolleson?

The roofing permit for a $20,000 residential re-roof runs $440.55, based on Tolleson's sourced fee schedule.

How Are Permit Fees Calculated in Tolleson?

A residential building permit is tiered rates by job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Tolleson?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee) and Plan Review Fee (trade permits) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Tolleson Citywide Fee Schedule, Development Services (Res. 2595, effective April 25, 2025). See the official schedule. Last verified .

Other Jurisdictions in Maricopa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.