FreeEvery fee straight from the official city and county fee schedules. No signup.

Youngtown, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Youngtown, straight from the official fee schedule, with a free permit fee calculator below.

In Youngtown, a building permit for a $50,000 remodel runs $1,147.16 in permit fees, a $20,000 re-roof $664.54, a $10,000 HVAC change-out $433.54, a $10,000 electrical panel upgrade or rewire $433.54, and a $10,000 whole-house repipe $433.54. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Youngtown Community Development Fee Schedule web page (Building Permit Fee Schedule)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Call the building department at (623) 933-8286.

How Youngtown values a job: Permit fees are calculated on the project valuation you submit (materials, labor, overhead and profit), which Community Development reviews and will not accept below the minimum valuation from the Town's adopted Valuation Guides and building valuation table.

Schedule effective January 4, 2025. Last verified: October 9, 2026

Youngtown Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Youngtown

Re-roof or roof repair (priced on the building valuation table)
tiered rates by job value, minimum $85.00‡
The adopted table prints $150.75 for the first $2,000, while the band below reaches $130.75 at $2,000, and $442.75 for the first $25,000, while the band below reaches $472.75 at $25,000; each band is charged as printed, so a $25,001 job costs less than a $25,000 job.
Up to $500
$85.00
Over $500, up to $2,000
$85.00 plus $3.05 per additional $100
Over $2,000, up to $25,000
$150.75 plus $14.00 per additional $1,000
Over $25,000, up to $50,000
$442.75 plus $10.10 per additional $1,000
Over $50,000, up to $100,000
$695.25 plus $7.00 per additional $1,000
Over $100,000, up to $500,000
$1,045.25 plus $5.60 per additional $1,000
Over $500,000, up to $1,000,000
$3,285.25 plus $4.75 per additional $1,000
Over $1,000,000
$5,660.25 plus $3.65 per additional $1,000
Plan Check Fee
65% of the permit fee†

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in Youngtown

Homeowners and contractors planning a project check Youngtown roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Youngtown Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Youngtown are the same either way.

Kind of work

Fees in Youngtown are the same either way.

$
$500$100,000
Estimated roofing permit fee
$664.54
Included in this total
Roofing Permit Fee$402.75‡
$150.75 + 18 × $14.00 per $1,000 over $2,000, minimum $85.00 (see the fee table above)
The adopted table prints $150.75 for the first $2,000, while the band below reaches $130.75 at $2,000, and $442.75 for the first $25,000, while the band below reaches $472.75 at $25,000; each band is charged as printed, so a $25,001 job costs less than a $25,000 job.
Plan Check Fee$261.79
Total Estimate$664.54

‡ Awaiting confirmation from the jurisdiction.

Permit fees are calculated on the project valuation you submit (materials, labor, overhead and profit), which Community Development reviews and will not accept below the minimum valuation from the Town's adopted Valuation Guides and building valuation table.

Estimate only. Confirm with the Youngtown building department before applying. Phone: (623) 933-8286. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in Youngtown

Homeowners and contractors planning a project check Youngtown roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Youngtown

Youngtown has no online permit portal listed on its Community Development pages; applications are paper submittals. Submit two copies of your plans to the Community Development Department at Town Hall, 12030 N. Clubhouse Square, Youngtown, AZ 85363, or call (623) 933-8286 for help. Building permits and plan review are two separate fees, both due before the permit is issued; the plan review fee is paid at submittal and covers two reviews, and additional reviews are charged by the hour. Contractors also need a Town of Youngtown business license.

Source: Youngtown application instructions

Building Department Contact
Address
12030 N. Clubhouse Square, Youngtown, AZ 85363
Hours
Monday to Friday, 8:00 a.m. to 4:00 p.m.

Youngtown Permit Fee FAQs

How Much Does a Building Permit Cost in Youngtown?

The building permit for a $50,000 residential remodel runs $1,147.16, including the documented surcharges and minimum fees. The estimate is built from Youngtown's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Youngtown?

The roofing permit for a $20,000 residential re-roof runs $664.54, based on Youngtown's sourced fee schedule.

How Are Permit Fees Calculated in Youngtown?

A residential building permit is tiered rates by job value, minimum $85.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Youngtown?

On top of the base permit fee, the sourced schedule adds Plan Check Fee (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Youngtown Community Development Fee Schedule web page (Building Permit Fee Schedule). See the official schedule. Last verified .

Other Jurisdictions in Maricopa County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.