FreeEvery fee straight from the official city and county fee schedules. No signup.

Mexico Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Mexico Beach, straight from the official fee schedule, with a free permit fee calculator below.

Building permit estimates include the City's development order fee ($75 for remodels and accessory structures, $200 per unit for a new home); ask EPCI whether it is billed with the permit. Electrical, plumbing and mechanical permits are $0.70 per $1,000 of total valuation with a $75 minimum, so most trade jobs pay the minimum; EPCI has not confirmed whether that valuation is the trade contract or the whole project.

In Mexico Beach, a building permit for a $50,000 remodel runs $457.50 in permit fees, a $20,000 re-roof $79.00, a $10,000 HVAC change-out $79.00, a $10,000 electrical panel upgrade or rewire $79.00, and a $10,000 whole-house repipe $79.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

EPCI Building Permit Fee Schedule (City of Mexico Beach Building Department); City of Mexico Beach Development Fee Schedule (Ord. 790 Exhibit A, August 2022)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Mexico Beach values a job: For building permits, construction value is based on the most recent International Code Council Building Valuation Data (per square foot of all area under roof, with the regional modifier) for the type of construction and use; for commercial buildings and buildings with three or more residential units, value is the total construction cost divided by the number of units, and each unit pays its own permit fee.

Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Mexico Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Plumbing Permit Fees in Mexico Beach

All projects
$0.70 per $1,000 of job value, minimum $75.00‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Failure to Call for Inspection (if applicable)
$75.00
Re-inspection Fee (if applicable)
$75.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Plumber in Mexico Beach

Homeowners and contractors planning a project check Mexico Beach plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Mexico Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$50,000
Estimated plumbing permit fee
$79.00
Included in this total
Plumbing Permit Fee$7.00‡
$10,000 × $0.70 per $1,000, minimum $75.00
Minimum Permit Fee Adjustment$68.00
Minimum permit fee: $75.00
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$79.00

‡ Awaiting confirmation from the jurisdiction.

Building permit estimates include the City's development order fee ($75 for remodels and accessory structures, $200 per unit for a new home); ask EPCI whether it is billed with the permit. Electrical, plumbing and mechanical permits are $0.70 per $1,000 of total valuation with a $75 minimum, so most trade jobs pay the minimum; EPCI has not confirmed whether that valuation is the trade contract or the whole project.

For building permits, construction value is based on the most recent International Code Council Building Valuation Data (per square foot of all area under roof, with the regional modifier) for the type of construction and use; for commercial buildings and buildings with three or more residential units, value is the total construction cost divided by the number of units, and each unit pays its own permit fee.

Estimate only. Confirm with the Mexico Beach building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Plumber in Mexico Beach

Homeowners and contractors planning a project check Mexico Beach plumbing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Mexico Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Mexico Beach?

The building permit for a $50,000 residential remodel runs $457.50, including the documented surcharges and minimum fees. The estimate is built from Mexico Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Mexico Beach?

The roofing permit for a $20,000 residential re-roof runs $79.00, based on Mexico Beach's sourced fee schedule.

How Are Permit Fees Calculated in Mexico Beach?

A residential building permit is $6.00 per $1,000 of job value, minimum $75.00. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Mexico Beach?

On top of the base permit fee, the sourced schedule adds Plan Review (commercial re-roof) (50% of the permit fee), Plan Review (commercial) (50% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Mexico Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from EPCI Building Permit Fee Schedule (City of Mexico Beach Building Department); City of Mexico Beach Development Fee Schedule (Ord. 790 Exhibit A, August 2022). See the official schedule. Last verified .

Other Jurisdictions in Bay County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.