Building Permit Fees in Davie, FL (2026)

In Davie, a building permit for a $50,000 remodel runs $928.88 in permit fees, a $20,000 re-roof $371.65, a $10,000 HVAC change-out $187.40, a $10,000 electrical panel upgrade or rewire $187.40, and a $10,000 whole-house repipe $187.40. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Town of Davie Building Permit Fee Schedule, Exhibit A (modified fees effective October 1, 2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $55.00.

How Davie values a job: Construction value is determined by the Building Division using a nationally recognized cost analysis program, or by the signed contract between the owner and the contractor.

Schedule effective October 1, 2025. Last verified: August 31, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Davie Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Davie

Standard (% of construction value)
tiered rates (see fee table), minimum $55.00
$0–$15,000,000
$9.50 per $1,000
$15,000,000–$30,000,000
$142,500.00 + $7.50 per $1,000
$30,000,000–$45,000,000
$255,000.00 + $5.00 per $1,000
Over $45,000,000
$330,000.00 + $2.50 per $1,000
Davie - BCAIB Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Davie - BORA Surcharge (Broward County Code Ch. 43, Sec. 43.1)
tiered by job value, minimum $2.00
Over $0
$0.52 per $1,000
Davie - DBPR Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Davie - Plan Review Fee
0.75% of job value, minimum $25.00
Davie - Technology Fee
6% of the permit fee
Davie - Training and Education Surcharge
0.025% of job value, minimum $2.00
Davie - Change of Contractor (After Permit Issued) (if applicable)
$100.00
Davie - Early Start Letter (if applicable)
$200.00
Davie - Electrical Temp for Test (Extension, 31+ Days) (if applicable)
$200.00
Davie - Electrical Temp for Test (First 30 Days) (if applicable)
$100.00
Davie - Fire Prevention Technology Fee (if applicable)
6% of the permit fee
Davie - Fire Prevention Training and Education Surcharge (if applicable)
0.025% of job value
Davie - Permit Card Replacement (if applicable)
$28.00
Davie - Permit Extension (Active Permit) (if applicable)
$75.00
Davie - Pre/Early Plan Review (Per Required Discipline) (if applicable)
$500.00
Davie - Re-inspection Fee (First Occurrence) (if applicable)
$75.00
Davie - Re-inspection Fee (Second Occurrence) (if applicable)
$100.00
Davie - Re-inspection Fee (Third+ Occurrence) (if applicable)
$150.00
Davie - Renewal of Expired Permit (After 90 Days) (if applicable)
100% of the permit fee
Davie - Renewal of Expired Permit (Within 90 Days) (if applicable)
50% of the permit fee
Davie - Specialty Overtime/After Hours Inspection (Per Discipline) (if applicable)
$400.00
Davie - Specialty Overtime/After Hours Plan Review (Per Discipline) (if applicable)
$500.00
Davie - Truss Plan / Shop Drawing / Product Approval Review (After Permit) (if applicable)
$50.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Electrician in Davie

Homeowners and contractors planning a project check Davie electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Davie Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Davie are the same either way.

Kind of work
$
$500$100,000
Estimated electrical permit fee
$187.40
Electrical permit fee$95.00
tiered rates (see fee table), minimum $55.00
Davie - BCAIB Surcharge (F.S. 468.631)$2.00
Davie - BORA Surcharge (Broward County Code Ch. 43, Sec. 43.1)$5.20
Davie - DBPR Surcharge (F.S. 553.721)$2.00
Davie - Plan Review Fee$75.00
Davie - Technology Fee$5.70
Davie - Training and Education Surcharge$2.50
Total Estimate$187.40

Construction value is determined by the Building Division using a nationally recognized cost analysis program, or by the signed contract between the owner and the contractor.

Estimate only. Confirm with the Davie building department before applying.

Sponsor This Page
Be the Featured Electrician in Davie

Homeowners and contractors planning a project check Davie electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Davie Permit Fee FAQs

How Much Is a Building Permit in Davie?

The building permit for a $50,000 residential remodel runs $928.88, including the documented surcharges and minimum fees. The estimate is built from Davie's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Davie?

The roofing permit for a $20,000 residential re-roof runs $371.65, based on Davie's sourced fee schedule.

How Are Permit Fees Calculated in Davie?

A residential building permit is tiered rates (see fee table), minimum $55.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Davie?

The sourced schedule sets a minimum permit fee of $55.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Davie?

On top of the base permit fee, the sourced schedule adds Davie - BCAIB Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), Davie - DBPR Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00) and Davie - Technology Fee (6% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Davie?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Davie Building Permit Fee Schedule, Exhibit A (modified fees effective October 1, 2025). See the official schedule. Last verified .

Compare Permit Fees Across Broward County

The same job, priced by each jurisdiction's own fee schedule. Across Broward County's 24 covered jurisdictions, a building permit for a $50,000 remodel runs from $509.50 (Plantation) to $4,262.98 (Tamarac).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Broward County$1,819.00$838.40
Cooper City$1,573.50$526.90
Coral Springs$1,015.50$487.18
Davie$928.88$371.65
Deerfield Beach$1,307.25$522.90
Fort Lauderdale$927.88$374.15
Hallandale Beach$1,601.13$743.65
Hillsboro Beach$1,390.76$556.30
Hollywood$1,284.68$569.48
Lauderdale Lakes$1,386.79$687.88
Lauderdale-by-the-Sea$1,600.50$352.50
Lauderhill$2,365.00$865.50
Margate$1,930.00$315.63
Miramar$1,470.38$633.15
Oakland Park$1,473.50$681.65
Parkland$1,478.75$553.50
Pembroke Park$909.75$432.90
Pembroke Pines$2,030.90$522.90
Plantation$509.50$396.00
Sunrise$2,844.75$456.00
Tamarac$4,262.98$323.90
West Park$1,355.17$577.20
Weston$1,068.58$567.35
Wilton Manors$1,224.25$584.65

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.