FreeEvery fee straight from the official city and county fee schedules. No signup.

Hollywood, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Hollywood, straight from the official fee schedule, with a free permit fee calculator below.

In Hollywood, a building permit for a $50,000 remodel runs $1,284.68 in permit fees, a $20,000 re-roof $569.48, a $10,000 HVAC change-out $331.08, a $10,000 electrical panel upgrade or rewire $331.08, and a $10,000 whole-house repipe $331.08. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

R-2026-308, Exhibit A: FY 2027 Comprehensive Schedule of Fees (adopted September 16, 2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $100.00.

Apply online at the Hollywood permit portal, or call 954-921-3335.

How Hollywood values a job: Hollywood bases permit fees on the value of the work, including labor and materials; the city may compare your cost estimate against standard construction cost data.

Schedule effective September 16, 2026. Last verified: October 14, 2026

This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed

Hollywood Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Hollywood

Standard
tiered rates by job value, minimum $100.00
Up to $1,000
$100.00
Over $1,000, up to $1,000,000
$100.00 plus $22.00 per additional $1,000
Over $1,000,000, up to $2,000,000
$22,078.00 plus $16.50 per additional $1,000
Over $2,000,000
$38,578.00 plus $11.50 per additional $1,000
Broward County Surcharge
tiered by job value, minimum $2.00†
Over $0
$0.52 per $1,000
Educational Fee
1% of the permit fee
Process Fee (non-new-construction permits)
$10.00‡
Technology Fee
2% of the permit fee
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1.5% of the permit fee, minimum $2.00‡
Private Provider Reduction (inspections)
may reduce the permit fee by 16%
Private Provider Reduction (plan review) (remodel/alteration)
may reduce designated fees by 28% (28% off the $10 process fee)
Application Extension (if applicable)
10% of the permit fee, minimum $20.00, maximum $300.00
Certificate of Completion (contractor permits) (if applicable)
3% of the permit fee, minimum $45.00
Certificate of Completion (owner permits) (if applicable)
1% of the permit fee, minimum $15.00
Certificate of Occupancy (Commercial) (if applicable)
3% of the permit fee, minimum $50.00
Certificate of Occupancy (Temporary) (if applicable)
3% of the permit fee, minimum $100.00
Certificate of Occupancy or Completion (Partial) (if applicable)
3% of the permit fee, minimum $100.00
Change of Contractor (if applicable)
$50.00
Early Start Request (if applicable)
$200.00
Expired Permit Reissuance (if applicable)
50% of the permit fee
Permit Extension (180 days) (if applicable)
10% of the permit fee, minimum $20.00, maximum $300.00
Process Fee (paid when you apply, counts toward the permit fee)
25% of the permit fee‡
Re-Inspection Fee (if applicable)
$75.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Hollywood

Homeowners and contractors planning a project check Hollywood mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Hollywood Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Hollywood are the same either way.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

$
$500$50,000
Estimated mechanical / HVAC permit fee
$331.08
Included in this total
Mechanical / HVAC Permit Fee$298.00
$100.00 + $9,000 × $22.00 per $1,000 over $1,000, minimum $100.00 (see the fee table above)
Broward County Surcharge$5.20
Process Fee (Non-New-Construction Permits)$10.00‡
Educational Fee$2.98
Technology Fee$5.96
State Building Code Administrators Surcharge (F.S. 468.631)$4.47
State Building Permit Surcharge (F.S. 553.721)$4.47‡
Total Estimate$331.08
Paid when you apply, counts toward this total
Process Fee$74.50‡
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

‡ Awaiting confirmation from the jurisdiction.

Hollywood bases permit fees on the value of the work, including labor and materials; the city may compare your cost estimate against standard construction cost data.

Estimate only. Confirm with the Hollywood building department before applying. Apply online. Phone: 954-921-3335. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured HVAC Company in Hollywood

Homeowners and contractors planning a project check Hollywood mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Hollywood

Hollywood takes all new building permit applications online through the Accela Citizen Access (ACA) portal, where you can apply, upload documents, pay fees, and manage your permit. The city moved new applications to Accela on August 4, 2026; permits issued earlier in the older BCLA system are looked up through the city's BCLA permit search, and submittals for them go to ePermits@hollywoodfl.org. For in-person help, the Building Division is at the Development Services Hub on the second floor of the library at City Hall Circle, 2600 Hollywood Blvd, and you can book time with a permit representative or plans examiner through the city's QLess virtual check-in. Schedule inspections for Accela permits in the portal. For older BCLA permits, use the online permit search or the automated inspection line at 954-921-3646, which is available 24 hours a day.

Source: Hollywood application instructions

Apply online: Hollywood permit portal
Building Department Contact
Phone
954-921-3335 (option 1, Building)
Address
Development Services Hub, Second Floor Library, City Hall Circle, 2600 Hollywood Blvd, Hollywood, FL 33020
Hours
Monday to Thursday, 7:00 a.m. to 6:00 p.m.

Hollywood Permit Fee FAQs

How Much Does a Building Permit Cost in Hollywood?

The building permit for a $50,000 residential remodel runs $1,284.68, including the documented surcharges and minimum fees. The estimate is built from Hollywood's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Hollywood?

The roofing permit for a $20,000 residential re-roof runs $569.48, based on Hollywood's sourced fee schedule.

How Are Permit Fees Calculated in Hollywood?

A residential building permit is tiered rates by job value, minimum $100.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Hollywood?

The sourced schedule sets a minimum permit fee of $100.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Hollywood?

On top of the base permit fee, the sourced schedule adds Educational Fee (1% of the permit fee), Technology Fee (2% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1.5% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Hollywood?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from R-2026-308, Exhibit A: FY 2027 Comprehensive Schedule of Fees (adopted September 16, 2026). See the official schedule. Last verified .

Other Jurisdictions in Broward County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.