Building Permit Fees in Lauderdale-by-the-Sea, FL (2026)
In Lauderdale-by-the-Sea, a building permit for a $50,000 remodel runs $1,600.50 in permit fees, a $20,000 re-roof $352.50, a $10,000 HVAC change-out $244.60, a $10,000 electrical panel upgrade or rewire $244.60, and a $10,000 whole-house repipe $244.60. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Resolution 2026-25, Town of Lauderdale-By-The-Sea, Exhibit A Building Permit and Inspection Fee Schedule, effective July 1, 2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $90.00.
How Lauderdale-by-the-Sea values a job: Chargeable valuation is the total cost of construction (labor and materials), determined from the applicant's submitted cost, a signed contract, or R.S. Means Construction Valuation System figures, as determined by the Building Official.
Schedule effective July 1, 2026. Last verified: September 1, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Lauderdale-by-the-Sea Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Lauderdale-by-the-Sea
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Lauderdale-by-the-Sea electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageLauderdale-by-the-Sea Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Chargeable valuation is the total cost of construction (labor and materials), determined from the applicant's submitted cost, a signed contract, or R.S. Means Construction Valuation System figures, as determined by the Building Official.
Estimate only. Confirm with the Lauderdale-by-the-Sea building department before applying.
Homeowners and contractors planning a project check Lauderdale-by-the-Sea electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageLauderdale-by-the-Sea Permit Fee FAQs
How Much Is a Building Permit in Lauderdale-by-the-Sea?
How Much Is a Roofing Permit in Lauderdale-by-the-Sea?
How Are Permit Fees Calculated in Lauderdale-by-the-Sea?
What Is the Minimum Permit Fee in Lauderdale-by-the-Sea?
What Surcharges Are Added to Permits in Lauderdale-by-the-Sea?
Do I Need a Permit for a Small Residential Job in Lauderdale-by-the-Sea?
Where Do These Fees Come From?
Compare Permit Fees Across Broward County
The same job, priced by each jurisdiction's own fee schedule. Across Broward County's 24 covered jurisdictions, a building permit for a $50,000 remodel runs from $509.50 (Plantation) to $4,262.98 (Tamarac).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Broward County | $1,819.00 | $838.40 |
| Cooper City | $1,573.50 | $526.90 |
| Coral Springs | $1,015.50 | $487.18 |
| Davie | $928.88 | $371.65 |
| Deerfield Beach | $1,307.25 | $522.90 |
| Fort Lauderdale | $927.88 | $374.15 |
| Hallandale Beach | $1,601.13 | $743.65 |
| Hillsboro Beach | $1,390.76 | $556.30 |
| Hollywood | $1,284.68 | $569.48 |
| Lauderdale Lakes | $1,386.79 | $687.88 |
| Lauderdale-by-the-Sea | $1,600.50 | $352.50 |
| Lauderhill | $2,365.00 | $865.50 |
| Margate | $1,930.00 | $315.63 |
| Miramar | $1,470.38 | $633.15 |
| Oakland Park | $1,473.50 | $681.65 |
| Parkland | $1,478.75 | $553.50 |
| Pembroke Park | $909.75 | $432.90 |
| Pembroke Pines | $2,030.90 | $522.90 |
| Plantation | $509.50 | $396.00 |
| Sunrise | $2,844.75 | $456.00 |
| Tamarac | $4,262.98 | $323.90 |
| West Park | $1,355.17 | $577.20 |
| Weston | $1,068.58 | $567.35 |
| Wilton Manors | $1,224.25 | $584.65 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.