Building Permit Fees in Lauderdale Lakes, FL (2026)
In Lauderdale Lakes, a building permit for a $50,000 remodel runs $1,386.79 in permit fees, a $20,000 re-roof $687.88, a $10,000 HVAC change-out $441.23, a $10,000 electrical panel upgrade or rewire $441.23, and a $10,000 whole-house repipe $441.23. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Lauderdale Lakes Community Development Fee Schedule (Code Ch. 13, Sec. 1301-1312)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $105.00.
How Lauderdale Lakes values a job: Chargeable valuation is the verified contract price, or, if the Building Official finds that estimate unrealistically low, the estimated construction cost computed per R.S. Means Company Cost Data, whichever is greater.
Schedule effective July 24, 2012. Last verified: September 1, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Lauderdale Lakes Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Lauderdale Lakes
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Lauderdale Lakes electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageLauderdale Lakes Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Lauderdale Lakes are the same either way.
Fees in Lauderdale Lakes are the same either way.
Chargeable valuation is the verified contract price, or, if the Building Official finds that estimate unrealistically low, the estimated construction cost computed per R.S. Means Company Cost Data, whichever is greater.
Estimate only. Confirm with the Lauderdale Lakes building department before applying.
Homeowners and contractors planning a project check Lauderdale Lakes electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageLauderdale Lakes Permit Fee FAQs
How Much Is a Building Permit in Lauderdale Lakes?
How Much Is a Roofing Permit in Lauderdale Lakes?
How Are Permit Fees Calculated in Lauderdale Lakes?
What Is the Minimum Permit Fee in Lauderdale Lakes?
What Surcharges Are Added to Permits in Lauderdale Lakes?
Do I Need a Permit for a Small Residential Job in Lauderdale Lakes?
Where Do These Fees Come From?
Compare Permit Fees Across Broward County
The same job, priced by each jurisdiction's own fee schedule. Across Broward County's 24 covered jurisdictions, a building permit for a $50,000 remodel runs from $509.50 (Plantation) to $4,262.98 (Tamarac).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Broward County | $1,819.00 | $838.40 |
| Cooper City | $1,573.50 | $526.90 |
| Coral Springs | $1,015.50 | $487.18 |
| Davie | $928.88 | $371.65 |
| Deerfield Beach | $1,307.25 | $522.90 |
| Fort Lauderdale | $927.88 | $374.15 |
| Hallandale Beach | $1,601.13 | $743.65 |
| Hillsboro Beach | $1,390.76 | $556.30 |
| Hollywood | $1,284.68 | $569.48 |
| Lauderdale Lakes | $1,386.79 | $687.88 |
| Lauderdale-by-the-Sea | $1,600.50 | $352.50 |
| Lauderhill | $2,365.00 | $865.50 |
| Margate | $1,930.00 | $315.63 |
| Miramar | $1,470.38 | $633.15 |
| Oakland Park | $1,473.50 | $681.65 |
| Parkland | $1,478.75 | $553.50 |
| Pembroke Park | $909.75 | $432.90 |
| Pembroke Pines | $2,030.90 | $522.90 |
| Plantation | $509.50 | $396.00 |
| Sunrise | $2,844.75 | $456.00 |
| Tamarac | $4,262.98 | $323.90 |
| West Park | $1,355.17 | $577.20 |
| Weston | $1,068.58 | $567.35 |
| Wilton Manors | $1,224.25 | $584.65 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.