Margate, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Margate, straight from the official fee schedule, with a free permit fee calculator below.
In Margate, a building permit for a $50,000 remodel runs $1,956.00 in permit fees, a re-roof $326.03, a $10,000 HVAC change-out $244.45, a $10,000 electrical panel upgrade or rewire $214.20, and a $10,000 whole-house repipe $194.20. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Margate Building and Code Services Department, Schedule of Fees and Penalties for Services and Permits, Effective 7/1/2026 (per Resolution ID 2026-170, adopted 2026-07-01)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $75.00.
Apply online at the Margate permit portal, or call 954-970-3004.
How Margate values a job: Margate charges permit fees as a percentage of the total cost of construction stated on the permit application.
Schedule effective July 1, 2026. Last verified: October 14, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Margate Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Margate
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Margate building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMargate Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
9 documented rates for this permit type; pick the one that matches your job.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
This fee rate is higher than in most Florida jurisdictions; it matches Margate's official schedule as published.
Margate charges permit fees as a percentage of the total cost of construction stated on the permit application.
Estimate only. Confirm with the Margate building department before applying. Apply online. Phone: 954-970-3004. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Margate building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Margate
Margate accepts new permit applications only online through ProjectDox. Create an account or log in on the city's ProjectDox portal, then upload the current Broward County Uniform Permit Application (the version dated January 8, 2026) with your plans. You can pay for and track permits through the city's Click2Gov building permits site. For permit numbers after 23-2124, schedule inspections online at inspections.margatefl.com. For older permits, call the automated inspection line at 954-970-3112. Requests made before 2:00 p.m. are scheduled for the next business day, and inspections run Monday through Thursday.
Source: Margate application instructions
Apply online: Margate permit portal- Phone
- 954-970-3004
- Address
- 901 NW 66th Avenue, Suite B, Margate, FL 33063
- Hours
- Permit window Monday to Friday, 7:30 a.m. to 5:30 p.m.
- Source
- Official contact page
Margate Permit Fee FAQs
How Much Does a Building Permit Cost in Margate?
How Much Does a Roofing Permit Cost in Margate?
How Are Permit Fees Calculated in Margate?
What Is the Minimum Permit Fee in Margate?
What Surcharges Are Added to Permits in Margate?
Do I Need a Permit for a Small Residential Job in Margate?
Where Do These Fees Come From?
Other Jurisdictions in Broward County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.