Delray Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Delray Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Delray Beach, a building permit for a $50,000 remodel runs $2,160.70 in permit fees, a $20,000 re-roof $469.45, a $10,000 HVAC change-out $438.70, a $10,000 electrical panel upgrade or rewire $438.70, and a $10,000 whole-house repipe $438.70. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution No. 208-24, Exhibit A (Development Services Fee Schedule), adopted October 15, 2024
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Delray Beach permit portal, or call (561) 243-7200.
How Delray Beach values a job: Permit fees are based on the contracted amount and the scope of work, per the City's Building FAQ.
Schedule effective October 15, 2024. Last verified: September 11, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Delray Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Delray Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Delray Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDelray Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
4 documented rates for this permit type; pick the one that matches your job.
This fee rate is higher than in most Florida jurisdictions; it matches Delray Beach's official schedule as published.
Permit fees are based on the contracted amount and the scope of work, per the City's Building FAQ.
Estimate only. Confirm with the Delray Beach building department before applying. Apply online. Phone: (561) 243-7200. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Delray Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Delray Beach
Delray Beach building permits are submitted online through the City's eServices portal, where you register, apply, upload plans and documents as PDFs, answer review comments, pay fees, and download the issued permit. If you do not have digital plans, the Building Division at 100 NW 1st Avenue will scan paper documents for a fee. Inspections are requested in eServices from the permit's inspections tab. A/C change-out, water heater replacement, and re-roof permits are express permits issued within three days.
Source: Delray Beach application instructions
Apply online: Delray Beach permit portal- Phone
- (561) 243-7200 (option 3 for permit technicians)
- Address
- 100 NW 1st Avenue, Delray Beach, FL 33444 (north of the main City Hall entrance)
- Hours
- Monday to Friday, 8:00 a.m. to 5:00 p.m. (excluding holidays)
- Source
- Official contact page
Delray Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Delray Beach?
How Much Does a Roofing Permit Cost in Delray Beach?
How Are Permit Fees Calculated in Delray Beach?
What Surcharges Are Added to Permits in Delray Beach?
Do I Need a Permit for a Small Residential Job in Delray Beach?
Where Do These Fees Come From?
Other Jurisdictions in Palm Beach County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.