Greenacres, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Greenacres, straight from the official fee schedule, with a free permit fee calculator below.
In Greenacres, a building permit for a $50,000 remodel runs $1,281.25 in permit fees, a $20,000 re-roof $512.50, a $10,000 HVAC change-out $256.25, a $10,000 electrical panel upgrade or rewire $256.25, and a $10,000 whole-house repipe $256.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Greenacres Permit Fee Schedule (per Resolution 2024-46)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Greenacres permit portal, or call 561-642-2052.
Schedule effective October 1, 2024. Last verified: September 25, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Greenacres Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Greenacres
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Greenacres building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGreenacres Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Greenacres are the same either way.
‡ Awaiting confirmation from the jurisdiction.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Greenacres building department before applying. Apply online. Phone: 561-642-2052. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Greenacres building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Greenacres
Greenacres accepts new building permit applications and plans only online through the MGO Connect portal, where you register, submit, track status, and pay. Contractors must enroll with the City through the same portal before pulling permits. A non-refundable $75 application fee is due at submission and is credited toward the permit fee at issuance. For permits submitted on or after April 15, 2026, schedule inspections through the MGO portal by 3:00 p.m. the business day before; older permits schedule by calling 561-642-2062 or emailing inspections@greenacresfl.gov.
Source: Greenacres application instructions
Apply online: Greenacres permit portal- Phone
- 561-642-2052
- Address
- Greenacres City Hall, 5800 Melaleuca Lane, Greenacres, FL 33463
- Hours
- Monday through Friday, 8:00 AM to 4:30 PM
- Source
- Official contact page
Greenacres Permit Fee FAQs
How Much Does a Building Permit Cost in Greenacres?
How Much Does a Roofing Permit Cost in Greenacres?
How Are Permit Fees Calculated in Greenacres?
What Surcharges Are Added to Permits in Greenacres?
Do I Need a Permit for a Small Residential Job in Greenacres?
Where Do These Fees Come From?
Other Jurisdictions in Palm Beach County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.