FreeEvery fee straight from the official city and county fee schedules. No signup.

Greenacres, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Greenacres, straight from the official fee schedule, with a free permit fee calculator below.

In Greenacres, a building permit for a $50,000 remodel runs $1,281.25 in permit fees, a $20,000 re-roof $512.50, a $10,000 HVAC change-out $256.25, a $10,000 electrical panel upgrade or rewire $256.25, and a $10,000 whole-house repipe $256.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Greenacres Permit Fee Schedule (per Resolution 2024-46)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective October 1, 2024. Last verified: September 11, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Greenacres Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Greenacres

All projects
tiered rates (see fee table), minimum $75.00
$0–$100,000
$0.00 + $25.00 per $1,000
$100,000–$300,000
$2,500.00 + $20.00 per $1,000
Over $300,000
$6,500.00 + $12.50 per $1,000
Sub-permit under master building permit, no independent review
$30.00 flat
Building Permit Zoning Review and Inspection
$54.75 per review or inspection
Commercial Plan Review Fee (New Construction) (new construction)
$550.00 to $1,000.00 by sq ft
$0–$20,000
$550.00
$20,000–$100,000
$800.00
Over $100,000
$1,000.00
Commercial Plan Review Fee (Remodel) (remodel/alteration)
$75.00 to $300.00 by sq ft
$0–$20,000
$75.00
$20,000–$100,000
$150.00
Over $100,000
$300.00
Greenacres - FL Building Code Enforcement Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Greenacres - FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Greenacres - Permit Application Fee (credited toward permit fee)
$75.00
Greenacres - Permit Extension, 1st (90 days) (if applicable)
$50.00
Greenacres - Permit Extension, 2nd (90 days) (if applicable)
$25.00
Greenacres - Plan Revision Fee, First Page (if applicable)
$50.00
Greenacres - Renewal of Expired Permit, One Year or Less (if applicable)
50% of the permit fee
Greenacres - Renewal of Expired Permit, Over One Year (if applicable)
100% of the permit fee
Plan Review Fee (Multi-Family Residential or PUD Single Family Master Building) (if applicable)
$300.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Greenacres

Homeowners and contractors planning a project check Greenacres electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Greenacres Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Greenacres are the same either way.

Rate type
$
$500$100,000
Estimated electrical permit fee
$256.25
Electrical permit fee$250.00
tiered rates (see fee table), minimum $75.00
Building Permit Zoning Review and Inspection$54.75 / review
Charged per review or inspection; not included in this total, as it depends on your project's unit count.
Greenacres - FL Building Code Enforcement Surcharge (F.S. 468.631)$3.75
Greenacres - FL Building Code Surcharge (F.S. 553.721)$2.50
Greenacres - Permit Application Fee (not added to total)$75.00
Paid up front; credited against the final permit fee.
Total Estimate$256.25

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Greenacres building department before applying.

Sponsor This Page
Be the Featured Electrician in Greenacres

Homeowners and contractors planning a project check Greenacres electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Greenacres Permit Fee FAQs

How Much Does a Building Permit Cost in Greenacres?

The building permit for a $50,000 residential remodel runs $1,281.25, including the documented surcharges and minimum fees. The estimate is built from Greenacres's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Greenacres?

The roofing permit for a $20,000 residential re-roof runs $512.50, based on Greenacres's sourced fee schedule.

How Are Permit Fees Calculated in Greenacres?

A residential building permit is tiered rates (see fee table), minimum $75.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Greenacres?

On top of the base permit fee, the sourced schedule adds Greenacres - FL Building Code Enforcement Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and Greenacres - FL Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Greenacres?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Greenacres Permit Fee Schedule (per Resolution 2024-46). See the official schedule. Last verified .

Other Jurisdictions in Palm Beach County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.