Building Permit Fees in Pinellas Park, FL (2026)
In Pinellas Park, a building permit for a $50,000 remodel runs $582.18 in permit fees, a $20,000 re-roof $319.11, a $10,000 HVAC change-out $154.00, a $10,000 electrical panel upgrade or rewire $154.00, and a $10,000 whole-house repipe $154.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft job area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Resolution No. 2026-08 (Exhibit A - Administrative Fee Schedule, Building Development Division section), City of Pinellas Park
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Pinellas Park values a job: Valuation must be submitted with the building permit application and must not be less than the latest published ICC Construction Valuation Cost Schedule or local average.
Schedule effective February 26, 2026. Last verified: August 25, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Pinellas Park Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Pinellas Park
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Pinellas Park building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PagePinellas Park Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Pinellas Park are the same either way.
Valuation must be submitted with the building permit application and must not be less than the latest published ICC Construction Valuation Cost Schedule or local average.
Estimate only. Confirm with the Pinellas Park building department before applying.
Homeowners and contractors planning a project check Pinellas Park building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PagePinellas Park Permit Fee FAQs
How Much Is a Building Permit in Pinellas Park?
How Much Is a Roofing Permit in Pinellas Park?
How Are Permit Fees Calculated in Pinellas Park?
What Surcharges Are Added to Permits in Pinellas Park?
Do I Need a Permit for a Small Residential Job in Pinellas Park?
Where Do These Fees Come From?
Compare Permit Fees Across Pinellas County
The same job, priced by each jurisdiction's own fee schedule. Across Pinellas County's 12 covered jurisdictions, a building permit for a $50,000 remodel runs from $355.63 (Tarpon Springs) to $1,701.25 (South Pasadena).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Clearwater | $471.39 | $218.67 |
| Dunedin | $510.00 | $204.40 |
| Gulfport | $1,165.10 | $570.35 |
| Largo | $662.50 | $265.00 |
| Madeira Beach | $637.50 | $205.00 |
| Pinellas Park | $582.18 | $319.11 |
| Seminole | $831.13 | $337.03 |
| South Pasadena | $1,701.25 | $686.25 |
| St. Pete Beach | $871.25 | $307.50 |
| St. Petersburg | $388.75 | $154.25 |
| Tarpon Springs | $355.63 | $171.48 |
| Treasure Island | $606.80 | $268.55 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.