Building Permit Fees in DeLand, FL (2026)

In DeLand, a $50,000 kitchen remodel runs about $630.47 in permit fees, a $15,000 re-roof about $116.50, an $8,000 HVAC change-out about $96.50, a $12,000 electrical panel upgrade or rewire about $129.00, an $8,000 whole-house repipe about $160.59, and a new $350,000 single-family home about $3,638.28. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of DeLand Exhibit A – Building Permit Fees (effective June 1, 2026), last verified July 17, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Residential (1–2 family) — Single phase
$0.625 per amp, minimum $62.50
Residential (1–2 family) — Three phase >240V
$1.25 per amp, minimum $62.50
Residential (1–2 family) — Three phase ≤240V
$0.9375 per amp, minimum $62.50
Commercial / 3+ units — Single phase
$0.625 per amp, minimum $125.00
Commercial / 3+ units — Three phase >240V
$1.25 per amp, minimum $125.00
Commercial / 3+ units — Three phase ≤240V
$0.9375 per amp, minimum $125.00
BCAI State Surcharge (§468.631 F.S.)
1.5% of the permit fee, minimum $2.00
DCA State Surcharge (§553.721 F.S.)
1% of the permit fee, minimum $2.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Source

City of DeLand Exhibit A – Building Permit Fees (effective June 1, 2026)

Schedule effective June 1, 2026. Last verified: July 17, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in DeLand are the same either way.

Rate type
amp
60400 amp
Estimated electrical permit fee
$129.00
Electrical permit fee$125.00
200 amps × $0.625 per amp
BCAI State Surcharge (§468.631 F.S.)$2.00
Schedule confirms the pass-through applies but does not print the rate; statutory 1.5% of permit fee, $2 min. Exempt from the +25% header (highlighted).
DCA State Surcharge (§553.721 F.S.)$2.00
Schedule confirms the pass-through applies but does not print the rate; statutory 1.0% of permit fee, $2 min. Exempt from the +25% header (highlighted).
Total estimate$129.00

Estimate only. Confirm with the DeLand building department before applying.