FreeEvery fee straight from the official city and county fee schedules. No signup.

DeLand, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for DeLand, straight from the official fee schedule, with a free permit fee calculator below.

DeLand has published a revised building permit fee schedule, Resolution 2026-64, which went to the City Commission on October 5, 2026 and is announced to take effect October 9, 2026: it raises the residential permit fee from $0.40 to $1.10 per square foot, changes plan review and commercial fees, and adds per-unit commercial trade fees. Until its adoption is confirmed, the estimates here use Resolution 2026-44 (effective October 1, 2026). Applications accepted for review by September 30, 2026 are charged the earlier valuation-based fees. See the official notice

In DeLand, a building permit for a remodel runs $354.00 in permit fees, a $20,000 re-roof $581.25, a $10,000 HVAC change-out $366.75, a $10,000 electrical panel upgrade or rewire $366.75, and a $10,000 whole-house repipe $366.75. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of DeLand Exhibit A, Building Permit & Inspection Fee Schedule (Resolution 2026-44, effective October 1, 2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the DeLand permit portal, or call 386-626-7007.

Schedule effective October 1, 2026. Last verified: September 27, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

DeLand Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in DeLand

All projects
$350.00 flat
Building Inspector Training Surcharge
$5.00
Inspection Fee
$100.00 per inspection
Technology Fee
5% of the permit fee
Permit Submittal Fee (Commercial)
$200.00
Permit Submittal Fee (Residential)
$100.00
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Private provider inspections: 25% reduction in inspection fees
may reduce designated fees by 25%†
Printed as: Inspection, 25% Reduction in calculated fees; Partial Inspection $75.00 per Inspection (25% reduction from $100 charge)
Private provider plan review: 25% reduction in plan review fees
may reduce designated fees by 25%†
Printed as: Plan Review, 25% Reduction in calculated fees (basis: the calculated plan review fees)

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Roofer in DeLand

Homeowners and contractors planning a project check DeLand roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

DeLand Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

Estimated roofing permit fee
$581.25
Included in this total
Roofing Permit Fee$350.00
$350.00 flat
Building Inspector Training Surcharge$5.00
Inspection Fee$100.00
Assumes 1 inspection; the building department sets the actual count for your project.
Permit Submittal Fee (Residential)$100.00
Technology Fee$17.50
State Building Code Administrators Surcharge (F.S. 468.631)$5.25
State Building Permit Surcharge (F.S. 553.721)$3.50
Total Estimate$581.25

DeLand has published a revised building permit fee schedule, Resolution 2026-64, which went to the City Commission on October 5, 2026 and is announced to take effect October 9, 2026: it raises the residential permit fee from $0.40 to $1.10 per square foot, changes plan review and commercial fees, and adds per-unit commercial trade fees. Until its adoption is confirmed, the estimates here use Resolution 2026-44 (effective October 1, 2026). Applications accepted for review by September 30, 2026 are charged the earlier valuation-based fees. See the official notice

Estimate only. Confirm with the DeLand building department before applying. Apply online. Phone: 386-626-7007. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Roofer in DeLand

Homeowners and contractors planning a project check DeLand roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in DeLand

Apply for a City of DeLand building permit online through the Accela Citizen Portal, where you can submit applications, upload plans, pay fees, schedule inspections, and track status. Register an account, choose the record type that matches your project (new building, addition, renovation, accessory structure, demolition, roof, or a single trade such as electric, mechanical, or plumbing), then complete every step and upload the required documents. A non-refundable submittal fee ($100 residential, $200 commercial) must be paid before any application is accepted for review, and fees can be paid in the portal or in person at City Hall, 120 S. Florida Avenue, DeLand, FL 32720. For help, contact the Building Division at 386-626-7007 or building@deland.org.

Source: DeLand application instructions

Apply online: DeLand permit portal
Building Department Contact
Phone
386-626-7007 (building), 386-626-7035 (inspection scheduling)
Address
120 S. Florida Avenue, DeLand, FL 32720

DeLand Permit Fee FAQs

How Much Does a Building Permit Cost in DeLand?

The building permit for a residential remodel runs $354.00, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from DeLand's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in DeLand?

The roofing permit for a $20,000 residential re-roof runs $581.25, based on DeLand's sourced fee schedule.

How Are Permit Fees Calculated in DeLand?

A residential building permit is $0.40 per square foot under roof, minimum $100.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in DeLand?

On top of the base permit fee, the sourced schedule adds Technology Fee (5% of the permit fee), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in DeLand?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of DeLand Exhibit A, Building Permit & Inspection Fee Schedule (Resolution 2026-44, effective October 1, 2026). See the official schedule. Last verified .

Other Jurisdictions in Volusia County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.