FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Deltona, FL (2026)

In Deltona, a building permit for a $50,000 remodel runs $256.13 in permit fees, a $20,000 re-roof $81.00, a $10,000 HVAC change-out $161.28, a $10,000 electrical panel upgrade or rewire $161.28, and a $10,000 whole-house repipe $161.28. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Resolution No. 2026-24 – Master Fee Schedule (adopted 4/6/2026), Exhibit A Building & Inspections

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $72.00.

How Deltona values a job: Deltona charges fees on the documented construction value of the work. For a new commercial or industrial structure valued over $3.9 million, the Building Official may verify the valuation against the construction contract and the latest ICC Building Valuation Data.

Schedule effective April 6, 2026. Last verified: July 22, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Deltona Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Deltona

Residential (1–2 family)
0.49% of job value, minimum $72.00
Residential (1–2 family)
0.56% of job value, minimum $72.00
Residential (1–2 family): Fence
$72.00 flat
Residential (1–2 family): Mobile/manufactured home set-up
$500.00 flat
Commercial / 3+ units
$72.00 plus 0.49% of job value
Commercial / 3+ units
0.56% of job value, minimum $72.00
Archive fee
$5.00
FL BCAIF surcharge (DBPR, §468.631)
1.5% of the permit fee, minimum $2.00
FL building-code enforcement surcharge (§553.721)
1% of the permit fee, minimum $2.00
Early start permit (if applicable)
$200.00
Early start permit (if applicable)
$100.00
Sponsor This Page
Be the Featured General Contractor in Deltona

Homeowners and contractors planning a project check Deltona building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Deltona Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
$
$2,500$500,000
Estimated building permit fee
$256.13
Building permit fee$245.00
0.49% of job value, minimum $72.00
Archive fee$5.00
FL BCAIF surcharge (DBPR, §468.631)$3.68
FL building-code enforcement surcharge (§553.721)$2.45
Total Estimate$256.13

Deltona charges fees on the documented construction value of the work. For a new commercial or industrial structure valued over $3.9 million, the Building Official may verify the valuation against the construction contract and the latest ICC Building Valuation Data.

Estimate only. Confirm with the Deltona building department before applying.

Sponsor This Page
Be the Featured General Contractor in Deltona

Homeowners and contractors planning a project check Deltona building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Deltona Permit Fee FAQs

How Much Is a Building Permit in Deltona?

The building permit for a $50,000 residential remodel runs $256.13, including the documented surcharges and minimum fees. The estimate is built from Deltona's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Deltona?

The roofing permit for a $20,000 residential re-roof runs $81.00, assuming a 2,000 sq ft (20-square) roof where the schedule prices per unit, based on Deltona's sourced fee schedule.

How Are Permit Fees Calculated in Deltona?

A residential building permit is 0.49% of job value, minimum $72.00. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are priced per square. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Deltona?

The sourced schedule sets a minimum permit fee of $72.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Deltona?

On top of the base permit fee, the sourced schedule adds FL BCAIF surcharge (DBPR, §468.631) (1.5% of the permit fee, minimum $2.00) and FL building-code enforcement surcharge (§553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Deltona?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution No. 2026-24 – Master Fee Schedule (adopted 4/6/2026), Exhibit A Building & Inspections. See the official schedule. Last verified .

Compare Permit Fees Across Volusia County

The same job, priced by each jurisdiction's own fee schedule. Across Volusia County's 13 covered jurisdictions, a building permit for a $50,000 remodel runs from $256.13 (Deltona) to $699.26 (New Smyrna Beach).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Volusia County$470.60$203.13
Daytona Beach$554.90$145.22
DeLand$630.47$216.50
Deltona$256.13$81.00
Edgewater$500.00$115.10
Holly Hill$381.38n/a
Lake Helen$470.60$203.13
New Smyrna Beach$699.26$91.90
Orange City$378.00$79.00
Ormond Beach$458.36$170.25
Ponce Inlet$487.50$209.00
Port Orange$491.88$134.00
South Daytona$583.95n/a

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.