FreeEvery fee straight from the official city and county fee schedules. No signup.

Building Permit Fees in Port Orange, FL (2026)

In Port Orange, a building permit for a $50,000 remodel runs $491.88 in permit fees, a $20,000 re-roof $134.00, a $10,000 HVAC change-out $89.00, a $10,000 electrical panel upgrade or rewire $89.00, and a $10,000 whole-house repipe $89.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Port Orange Commercial and Residential Building Permit Fees (Resolution No. 24-03, Revised 6/25/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Port Orange values a job: Chargeable construction value is determined using the most current edition of the ICC Building Valuation Data (not contract/bid price); this valuation basis applies to the Building, Electrical, Plumbing, and Mechanical percent-of-value permit fees.

Schedule effective June 25, 2026. Last verified: July 22, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Port Orange Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Port Orange

Residential (1–2 family)
0.8% of job value, minimum $50.00
Residential (1–2 family): Equipment Replacement (No Duct Change)
$50.00 flat
Commercial / 3+ units
0.8% of job value, minimum $90.00
Archive Fee
$5.00
Florida Surcharge Fee (BCAIF)
1.5% of the permit fee, minimum $2.00
Florida Surcharge Fee (DBPR)
1% of the permit fee, minimum $2.00
Sponsor This Page
Be the Featured HVAC Company in Port Orange

Homeowners and contractors planning a project check Port Orange mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Port Orange Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Port Orange are the same either way.

Rate type
$
$500$50,000
Estimated mechanical / HVAC permit fee
$89.00
Mechanical / HVAC permit fee$80.00
0.8% of job value, minimum $50.00
Archive Fee$5.00
Florida Surcharge Fee (BCAIF)$2.00
Florida Surcharge Fee (DBPR)$2.00
Total Estimate$89.00

Chargeable construction value is determined using the most current edition of the ICC Building Valuation Data (not contract/bid price); this valuation basis applies to the Building, Electrical, Plumbing, and Mechanical percent-of-value permit fees.

Estimate only. Confirm with the Port Orange building department before applying.

Sponsor This Page
Be the Featured HVAC Company in Port Orange

Homeowners and contractors planning a project check Port Orange mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Port Orange Permit Fee FAQs

How Much Is a Building Permit in Port Orange?

The building permit for a $50,000 residential remodel runs $491.88, including the documented surcharges and minimum fees. The estimate is built from Port Orange's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Is a Roofing Permit in Port Orange?

The roofing permit for a $20,000 residential re-roof runs $134.00, assuming a 2,000 sq ft (20-square) roof where the schedule prices per unit, based on Port Orange's sourced fee schedule.

How Are Permit Fees Calculated in Port Orange?

A residential building permit is 0.95% of job value, minimum $50.00. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are priced per square. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Port Orange?

On top of the base permit fee, the sourced schedule adds Florida Surcharge Fee (BCAIF) (1.5% of the permit fee, minimum $2.00) and Florida Surcharge Fee (DBPR) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Port Orange?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Port Orange Commercial and Residential Building Permit Fees (Resolution No. 24-03, Revised 6/25/2026). See the official schedule. Last verified .

Compare Permit Fees Across Volusia County

The same job, priced by each jurisdiction's own fee schedule. Across Volusia County's 13 covered jurisdictions, a building permit for a $50,000 remodel runs from $256.13 (Deltona) to $699.26 (New Smyrna Beach).

JurisdictionBuilding permit ($50k remodel)Roofing permit ($20k re-roof)
Unincorporated Volusia County$470.60$203.13
Daytona Beach$554.90$145.22
DeLand$630.47$216.50
Deltona$256.13$81.00
Edgewater$500.00$115.10
Holly Hill$381.38n/a
Lake Helen$470.60$203.13
New Smyrna Beach$699.26$91.90
Orange City$378.00$79.00
Ormond Beach$458.36$170.25
Ponce Inlet$487.50$209.00
Port Orange$491.88$134.00
South Daytona$583.95n/a

Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. "n/a" means the fee isn't documented in our sourced data.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.