Building Permit Fees in Port Orange, FL (2026)
In Port Orange, a $50,000 kitchen remodel runs about $491.88 in permit fees, a $15,000 re-roof about $134.00, an $8,000 HVAC change-out about $73.00, a $12,000 electrical panel upgrade or rewire about $105.00, an $8,000 whole-house repipe about $73.00, and a new $350,000 single-family home about $3,413.13. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of Port Orange Commercial and Residential Building Permit Fees (Resolution No. 24-03, Revised 6/25/2026), last verified July 19, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
City of Port Orange Commercial and Residential Building Permit Fees (Resolution No. 24-03, Revised 6/25/2026)
Schedule effective June 25, 2026. Last verified: July 19, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Port Orange are the same either way.
Estimate only. Confirm with the Port Orange building department before applying.