FreeEvery fee straight from the official city and county fee schedules. No signup.

Hillcrest Village, TX Permit Fees (2026)

Building permit fees and electrical, plumbing, and mechanical/HVAC permit fees for Hillcrest Village, straight from the official fee schedule, with a free permit fee calculator below.

Hillcrest Village has not published its building permit fee schedule. This page covers electrical, plumbing and HVAC permit fees from the city's permit forms; call the city office at 281-756-0577 for building, roofing, pool building, and commercial electrical or HVAC permit fees.

In Hillcrest Village, an HVAC change-out runs $127.00 in permit fees, and an electrical panel upgrade or rewire $131.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume one appliance and one panel. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Hillcrest Village permit application forms: Plumbing (Exhibit B), Electrical (Exhibit C) and Heating and Cooling (Exhibit D), fee schedule exhibits incorporated by Ordinance 5-2025

Covers electrical, plumbing, and mechanical/HVAC permits.

Call the building department at 281-756-0577.

Last verified: November 3, 2026

Hillcrest Village Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Hillcrest Village

Not documented in our sourced data yet; see the official schedule linked above.

Sponsor This Page
Be the Featured General Contractor in Hillcrest Village

Homeowners and contractors planning a project check Hillcrest Village building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Hillcrest Village Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Hillcrest Village are the same either way.

Hillcrest Village does not have a documented building fee for this project type in our sourced data yet. Check the official fee schedule linked above, or ask the building department.

Hillcrest Village has not published its building permit fee schedule. This page covers electrical, plumbing and HVAC permit fees from the city's permit forms; call the city office at 281-756-0577 for building, roofing, pool building, and commercial electrical or HVAC permit fees.

Estimate only. Confirm with the Hillcrest Village building department before applying. Phone: 281-756-0577. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Hillcrest Village

Homeowners and contractors planning a project check Hillcrest Village building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Hillcrest Village

Download the permit application for your trade (electrical, plumbing, HVAC or gas generator) or the general Permit Application Form from the city's Permits page and complete it; the forms list the fee items.

Send the completed forms and any permit questions to cityoffice@hillcrestvillagetx.gov or call the city office at 281-756-0577.

Certificates of insurance are made out to the City of Hillcrest Village, 200 W. Timberlane Drive, Alvin, TX 77511.

For a swimming pool, the city's Swimming Pool Permit Process requires engineered design drawings approved before the permit process, plus separate plumbing and electrical permit applications.

Call the city office to schedule inspections; the Permits page lists inspections Monday to Friday starting at 6:30 pm.

Post the permit where it is visible from the street on the front of the home.

Source: Hillcrest Village application instructions

Building Department Contact
Address
200 W. Timberlane Dr., Alvin, TX 77511
Hours
Monday to Thursday, 8:00 AM to 4:00 PM

Hillcrest Village Permit Fee FAQs

How Are Permit Fees Calculated in Hillcrest Village?

Electrical permits are priced per panel; Plumbing permits are priced per item; Mechanical / HVAC permits are priced per appliance. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Hillcrest Village permit application forms: Plumbing (Exhibit B), Electrical (Exhibit C) and Heating and Cooling (Exhibit D), fee schedule exhibits incorporated by Ordinance 5-2025. See the official schedule. Last verified .

Other Jurisdictions in Brazoria County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.