Double Oak, TX Permit Fees (2026)

Building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Double Oak, straight from the official fee schedule, with a free permit fee calculator below.

A note on these figures from the official schedule. Details

Double Oak prices additions and remodels under 1,200 sq ft as the required trade permits only, with the combined total capped at $500; the estimate shows no separate building charge for that work and does not apply the cap. Commercial electrical, plumbing and mechanical permits and commercial plan review are charged at actual cost with a printed minimum or administrative fee and are not estimated. Outside engineering, legal and professional review costs are billed at actual cost plus a $150 administrative fee.

In Double Oak, a building permit for a remodel runs $100.00 in permit fees, a $20,000 re-roof $110.00, a $10,000 HVAC change-out $110.00, a $10,000 electrical panel upgrade or rewire $110.00, and a $10,000 whole-house repipe $115.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Double Oak Code of Ordinances, Appendix A Fee Schedule, Sec. 4.100 Building Related Fees

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Double Oak permit portal, or call (469) 967-0592.

Last verified: November 20, 2026

Double Oak Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Double Oak

Residential (1–2 family): Addition or remodel
tiered rates by sq ft‡
Up to 1,200 sq ft
$0.00
Over 1,200 sq ft
$200.00
Residential (1–2 family): New home
$0.50 per sq ft (living area plus half of garage and covered porch area)
Residential (1–2 family): Aboveground pool plus fence
$325.00 flat
Residential (1–2 family): Accessory building on skids
$85.00 flat
Residential (1–2 family): Accessory building with slab
$175.00 flat
Residential (1–2 family): Accessory building with slab and electrical
$205.00 flat
Residential (1–2 family): Accessory building with slab, electrical and plumbing
$265.00 flat
Residential (1–2 family): Barn with cement floor and lights
$205.00 flat

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Double Oak

Homeowners and contractors planning a project check Double Oak building permit fees here first.

One sponsor per trade, flat monthly rate.

Double Oak Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

20 documented rates for this permit type; pick the one that matches your job.

sq ft
505,000 sq ft
Estimated building permit fee
$100.00
Included in this total
Building Permit Fee$0.00‡
$0.00 flat for up to 1,200 sq ft (see the fee table above)
Plan Review Fee (Residential Homes, Nonrefundable)$100.00‡
Total Estimate$100.00

‡ Awaiting confirmation from the jurisdiction.

A note on these figures from the official schedule. Details

Double Oak prices additions and remodels under 1,200 sq ft as the required trade permits only, with the combined total capped at $500; the estimate shows no separate building charge for that work and does not apply the cap. Commercial electrical, plumbing and mechanical permits and commercial plan review are charged at actual cost with a printed minimum or administrative fee and are not estimated. Outside engineering, legal and professional review costs are billed at actual cost plus a $150 administrative fee.

Estimate only. Confirm with the Double Oak building department before applying. Apply online. Phone: (469) 967-0592. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Double Oak

Homeowners and contractors planning a project check Double Oak building permit fees here first.

One sponsor per trade, flat monthly rate.

How to Apply for a Permit in Double Oak

Apply online through the Town of Double Oak iWorQ permit portal. Applications may also be mailed or delivered in person to Development Services, 320 Waketon Road, Double Oak, Texas 75077, or emailed to the address on the application form. Incomplete applications may be rejected. The Town uses a third-party contractor for permit reviews and inspections; request inspections through the portal before 4 p.m. for next-day scheduling. Work started before a permit is approved is subject to doubled permit fees.

Source: Double Oak application instructions

Apply online: Double Oak permit portal
Building Department Contact
Contact
Steve Koehler, Building Inspector
Address
320 Waketon Road, Double Oak, TX 75077
Hours
Monday to Friday, 8:00 am to 4:00 pm
Sponsor This Spot · Permit Help
Be the Featured Permit Expediter in Denton County

Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.

One expediter per county.

Double Oak Permit Fee FAQs

How Much Does a Building Permit Cost in Double Oak?

The building permit for a residential remodel runs $100.00, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from Double Oak's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Double Oak?

The roofing permit for a $20,000 residential re-roof runs $110.00, based on Double Oak's sourced fee schedule.

How Are Permit Fees Calculated in Double Oak?

A residential building permit is tiered rates by sq ft. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Double Oak Code of Ordinances, Appendix A Fee Schedule, Sec. 4.100 Building Related Fees. See the official schedule. Last verified .

Other Jurisdictions in Denton County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.