FreeEvery fee straight from the official city and county fee schedules. No signup.

Northlake, TX Permit Fees (2026)

Building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Northlake, straight from the official fee schedule, with a free permit fee calculator below.

In Northlake, a building permit for a remodel runs $600.00 in permit fees, a $10,000 HVAC change-out $50.00, a $10,000 electrical panel upgrade or rewire $50.00, and a $10,000 whole-house repipe $50.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Northlake Ord. 24-0613D, Exhibit A: Appendix A Fee Schedule, Article A2.000 Building and Construction Fees (Town Council packet, June 13, 2024)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Northlake permit portal, or call 940-350-9343.

How Northlake values a job: Applicants provide the actual value of construction on the permit application, and the town building official makes the final determination of construction value.

Schedule effective June 14, 2024. Last verified: November 20, 2026

Northlake Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Northlake

Residential (1–2 family): Addition or alteration of conditioned living space at a single-family or two-family home
$0.40 per sq ft (conditioned floor area), minimum $100.00
Residential (1–2 family): New single-family or two-family home
$0.80 per sq ft (conditioned floor area), minimum $1,000.00
Commercial / 3+ units: Commercial, industrial or mixed-use building, addition, remodel or finish-out (construction value table)
tiered rates by job value (Printed bases jump $0.50 at $25,001 and $2.00 at $50,001)
Up to $500
$23.50
Over $500, up to $2,000
$23.50 plus $3.05 per additional $100
Over $2,000, up to $25,000
$69.25 plus $14.00 per additional $1,000
Over $25,000, up to $25,001
$391.75
Over $25,001, up to $50,000
$391.75 plus $10.00 per additional $1,000
Over $50,000, up to $50,001
$643.75
Over $50,001, up to $100,000
$643.75 plus $7.00 per additional $1,000
Over $100,000, up to $500,000
$993.75 plus $5.60 per additional $1,000
Over $500,000, up to $1,000,000
$3,233.75 plus $4.75 per additional $1,000
Over $1,000,000, up to $1,000,001
$5,608.75
Over $1,000,001
$5,608.75 plus $3.65 per additional $1,000
Commercial / 3+ units: Multifamily residential addition or alteration of conditioned area
$0.20 per sq ft (conditioned floor area)
Commercial / 3+ units: Multifamily residential new construction
$0.50 per sq ft (conditioned floor area)
Demolition of a structure
$100.00 flat
Fence
$100.00 flat
Moving a structure
$100.00 flat

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Northlake

Homeowners and contractors planning a project check Northlake building permit fees here first.

One sponsor per trade, flat monthly rate.

Northlake Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

7 documented rates for this permit type; pick the one that matches your job.

sq ft
505,000 sq ft
Estimated building permit fee
$600.00
Included in this total
Building Permit Fee$80.00
200 sq ft (conditioned floor area) × $0.40 per sq ft (conditioned floor area)
Minimum Permit Fee Adjustment$20.00
Minimum permit fee: $100.00
Energy Code Review Fee$400.00‡
Plan Review Fee (Homes, Accessory Buildings and Pools)$100.00
Total Estimate$600.00
Not included in this total
Trades Fee (Per Trade, Home Additions and Alterations)$50.00 / trade
Charged per trade; depends on your project's number of trades.

‡ Awaiting confirmation from the jurisdiction.

Estimate only. Confirm with the Northlake building department before applying. Apply online. Phone: 940-350-9343. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Northlake

Homeowners and contractors planning a project check Northlake building permit fees here first.

One sponsor per trade, flat monthly rate.

How to Apply for a Permit in Northlake

Apply for residential and commercial building, trade and other construction permits online through the Town of Northlake's Community Core permitting portal. Contractors register in the portal before applying; property owners apply by selecting Community Member. SAFEbuilt performs building code plan review and inspections for the Town. Request inspections by email at inspections@cwistx.com or by phone at 940-521-0470, and find your permit and required inspections checklist under Documents in your Community Core permit record. Plan review fees are nonrefundable and due with application.

Source: Northlake application instructions

Apply online: Northlake permit portal
Building Department Contact
Address
1500 Commons Circle, Suite 300, Northlake, TX 76226
Sponsor This Spot · Permit Help
Be the Featured Permit Expediter in Denton County

Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.

One expediter per county.

Northlake Permit Fee FAQs

How Much Does a Building Permit Cost in Northlake?

The building permit for a residential remodel runs $600.00, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from Northlake's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Are Permit Fees Calculated in Northlake?

A residential building permit is $0.40 per sq ft (conditioned floor area), minimum $100.00. Electrical, Plumbing, and Mechanical / HVAC permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Northlake?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (commercial roofing) (65% of the permit fee) and Plan Review Fee (commercial) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Northlake Ord. 24-0613D, Exhibit A: Appendix A Fee Schedule, Article A2.000 Building and Construction Fees (Town Council packet, June 13, 2024). See the official schedule. Last verified .

Other Jurisdictions in Denton County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.