FreeEvery fee straight from the official city and county fee schedules. No signup.

The Colony, TX Permit Fees (2026)

Building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for The Colony, straight from the official fee schedule, with a free permit fee calculator below.

In The Colony, a building permit for a remodel runs $150.00 in permit fees, a $20,000 re-roof $175.00, a $10,000 HVAC change-out $150.00, a $10,000 electrical panel upgrade or rewire $150.00, and a $10,000 whole-house repipe $150.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of The Colony FY 2027 Master Fee Schedule (Res. 2026-060, effective October 1, 2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Call the building department at 972-624-3100.

How The Colony values a job: Commercial and multi-family building permits are valued at gross square feet times the International Code Council Square Foot Construction Costs table (shell-only buildings deduct 20 percent); trade and commercial re-roof permits are priced on the valuation of work stated on the application.

Schedule effective October 1, 2026. Last verified: November 20, 2026

The Colony Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in The Colony

Residential (1–2 family): Remodel or addition
$0.159 per sq ft, minimum $50.00
Residential (1–2 family): New home
$1.01 per sq ft
Residential (1–2 family): Manufactured home inspection
$275.00 flat
Residential (1–2 family): Manufactured or modular home moving permit
$100.00 flat
Residential (1–2 family): Residential accessory structure
$0.159 per sq ft, minimum $50.00
Commercial / 3+ units: Commercial alteration, remodel, or tenant finish-out (0.5% of ICC table valuation)
0.5% of job value (Permit fee multiplier 0.0050 times the ICC table valuation)
Commercial / 3+ units: New commercial or multi-family building (0.9% of ICC table valuation)
0.9% of job value (Permit fee multiplier 0.0090 times the ICC table valuation)
Commercial / 3+ units: Commercial cell tower
$100.00 flat

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in The Colony

Homeowners and contractors planning a project check The Colony building permit fees here first.

One sponsor per trade, flat monthly rate.

The Colony Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

18 documented rates for this permit type; pick the one that matches your job.

sq ft
505,000 sq ft
Estimated building permit fee
$150.00
Included in this total
Building Permit Fee$31.80
200 sq ft × $0.159 per sq ft
Minimum Permit Fee Adjustment$18.20
Minimum permit fee: $50.00
Permit Application Fee$50.00‡
Plan Review Fee (Remodel, Addition, or Accessory Structure)$50.00
Total Estimate$150.00

‡ Awaiting confirmation from the jurisdiction.

Estimate only. Confirm with the The Colony building department before applying. Phone: 972-624-3100. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in The Colony

Homeowners and contractors planning a project check The Colony building permit fees here first.

One sponsor per trade, flat monthly rate.

How to Apply for a Permit in The Colony

Email the completed City of The Colony permit application and all supporting documents, in PDF format only, to permits@thecolonytx.gov. Customer service staff will contact you by email or phone to collect the $50 application fee; applications are not processed until it is paid. Allow 10 to 15 business days for a plan review response. Contractors must register with the City before a permit is issued. After the permit is issued, schedule inspections online through the eTRAKiT portal, by phone at 972-624-3150, or by email.

Source: The Colony application instructions

Building Department Contact
Address
6053 Main Street, The Colony, TX 75056
Hours
Monday to Thursday 7:30 a.m. to 5:30 p.m.; Friday 7:30 a.m. to 11:30 a.m.
Inspections
972-624-3150 (Monday to Friday 7 a.m. to 4 p.m.)
Sponsor This Spot · Permit Help
Be the Featured Permit Expediter in Denton County

Your name, phone and website right here, next to the building department's contact info, where people look right before they apply.

One expediter per county.

The Colony Permit Fee FAQs

How Much Does a Building Permit Cost in The Colony?

The building permit for a residential remodel runs $150.00, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from The Colony's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in The Colony?

The roofing permit for a $20,000 residential re-roof runs $175.00, based on The Colony's sourced fee schedule.

How Are Permit Fees Calculated in The Colony?

A residential building permit is $0.159 per sq ft, minimum $50.00. Electrical, Plumbing, and Mechanical / HVAC permits scale with the value of the job; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in The Colony?

On top of the base permit fee, the sourced schedule adds Commercial and Multi-Family Plan Review Fee (25% of the permit fee), Other Building Permit Plan Review Fee (25% of the permit fee, minimum $50.00), Plan Review Fee (remodel, addition, or accessory structure) (25% of the permit fee, minimum $50.00) and Pool and Spa Plan Review Fee (25% of the permit fee, minimum $50.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of The Colony FY 2027 Master Fee Schedule (Res. 2026-060, effective October 1, 2026). See the official schedule. Last verified .

Other Jurisdictions in Denton County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.